Summary
Project consists of rehabilitating or abandoning twenty-six (26) culverts along the Little Papio Creek Channel. Culverts will be rehabilitated with a variety of methods including culvert abandonment, remove and replace, sliplining with HDPE liner, and lining with cured in place pipe (CIPP). Work also includes excavation, embankment, embankment (borrow), removal and replacement of timber pile outlet structures, manhole construction, culvert spalling and joint repairs, removal and replacement of pavement and structural concrete, stream bank stabilization, construction of temporary site access roads, removal and replacement of timber pile retaining walls, rip rap outlet protection, BMPs, traffic control, fence removal and replacement, and site restoration.