Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of rehabilitating or abandoning twenty-six (26) culverts along the Little Papio Creek Channel. Culverts will be rehabilitated with a variety of methods including culvert abandonment, remove and replace, sliplining with HDPE liner, and lining with cured in place pipe (CIPP). Work also includes excavation, embankment, embankment (borrow), removal and replacement of timber pile outlet structures, manhole construction, culvert spalling and joint repairs, removal and replacement of pavement and structural concrete, stream bank stabilization, construction of temporary site access roads, removal and replacement of timber pile retaining walls, rip rap outlet protection, BMPs, traffic control, fence removal and replacement, and site restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Mowing of the white river levee.
Posted Date
Nov 28, 2025
Due Date
Jan 7, 2026
Release: Nov 28, 2025
Close: Jan 7, 2026
Mowing of the white river levee.
AvailableFurnish a closure structure for the Cowlitz River Levee at the north end of the Rocky Point BNSF tunnel, and all training necessary to facilitate the District's deployment activities.
Posted Date
Dec 9, 2025
Due Date
Jan 8, 2026
Release: Dec 9, 2025
Close: Jan 8, 2026
Furnish a closure structure for the Cowlitz River Levee at the north end of the Rocky Point BNSF tunnel, and all training necessary to facilitate the District's deployment activities.
AvailableThe scope of this project is to furnish and install geofabric and stone armor to mitigate lagoon levee slope erosion.
Posted Date
Nov 23, 2025
Due Date
Jan 6, 2026
Release: Nov 23, 2025
Close: Jan 6, 2026
The scope of this project is to furnish and install geofabric and stone armor to mitigate lagoon levee slope erosion.
AvailableProvide levee repairs. Clear vegetation, install steel sheet piles, install earth anchors, and backfill/grade as shown on the plans. Excavated material will be reused onsite for backfill and grading. Demobilize when complete.
Posted Date
Nov 17, 2025
Due Date
Jan 5, 2026
Release: Nov 17, 2025
Close: Jan 5, 2026
Provide levee repairs. Clear vegetation, install steel sheet piles, install earth anchors, and backfill/grade as shown on the plans. Excavated material will be reused onsite for backfill and grading. Demobilize when complete.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis