Summary
Work includes generator will be installed within 15' of pump station building, image of location attache ; generator will be set on a 6" thick precast concrete pad, reinforced with #4 rebar 12" oc and 6" reveal on all sides; a 12" thick gravel subbase compacted at 6" lifts will be installed for the concrete pad; conduit runs from transfer switch will be stubbed up through concrete pad and base of generator; 100a service rated fusible automatic transfer switch will be installed adjacent to the existing meter channel. Provide a HDPE backboard & stainless hardware to support new switch as well as the existing manual transfer switch, generator plug & cellular communicator; existing transfer switch will remain in series on load side of new ats. See attached file.