Summary
Construction of the following Project: Lift Station No. 7 Reconstruction. The Project includes, but is not limited to, the following Work: Decommissioning the existing Lift Station No. 7 and constructing a new wastewater lift station, including demolition work, conversion of an existing wetwell to a sanitary sewer manhole, and installation of two sanitary sewer manholes; site work; installation of a gravity sewer line extension; installation of a wetwell structure with duplex pumps, pump slide rails, internal piping, and electrical and control systems with an emergency backup power connection; and installation of valve vault and effluent pressure sewer, including connection of a new pressure sewer to the existing pressure sewer, together with all other Work required to complete the Project as shown on the Drawings and specified herein.