Summary
DESIGN/BUILD: The project consists of two (2) packages worked as one (1) project. The first package is for the replacement of HVAC equipment in the gym area. It includes the removal of existing cabinet unit heaters, exhaust fans, and associated controls. This package will install new rooftop units for the middle school and high school gym, new cabinet unit heaters, and exhaust fans for the locker rooms. The second package consists of replacing HVAC equipment in the classroom area. This second package will remove existing HVAC equipment, which consists of a combination of unit ventilators, ducted fan coil units, and vestibule cabinet unit heaters. New installations will mimic the existing systems install.