Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Installation of two (2) level 2 electric vehicles chargers.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Purchase and installation of level 2 \"at home\" charging stations for the department of mental health and the albany county hall of records.
Posted Date
Dec 2, 2025
Due Date
Dec 17, 2025
Release: Dec 2, 2025
Close: Dec 17, 2025
Purchase and installation of level 2 \"at home\" charging stations for the department of mental health and the albany county hall of records.
AvailablePremium
Access the largest public sector contact database
Qualified vendors to fully fund, design, install, operate, maintain, market and potentially remove electrical vehicle (EV) charging stations, also known as electric vehicle supply equipment (EVSE), on publicly owned property for public use. This work will also include assisting the Township in identifying ideal site locations for the EVSE installations. The Township wishes to install one (1) Dual-Port Free Standing Level 2 Electronic Vehicle (EV) charging stations (208/240 V AC @30A; with remote access, network capability and Cable Management Kit) at a location to be determined.. Successful bidder will also be granted rights to install additional EVSE to future sites under the same terms and conditions.
Posted Date
Dec 1, 2025
Due Date
Jan 6, 2026
Release: Dec 1, 2025
Close: Jan 6, 2026
Qualified vendors to fully fund, design, install, operate, maintain, market and potentially remove electrical vehicle (EV) charging stations, also known as electric vehicle supply equipment (EVSE), on publicly owned property for public use. This work will also include assisting the Township in identifying ideal site locations for the EVSE installations. The Township wishes to install one (1) Dual-Port Free Standing Level 2 Electronic Vehicle (EV) charging stations (208/240 V AC @30A; with remote access, network capability and Cable Management Kit) at a location to be determined.. Successful bidder will also be granted rights to install additional EVSE to future sites under the same terms and conditions.
AvailableProvide turnkey services for electric vehicle supply equipment (evse), include design, purchasing, construction, installation of hardware (and accompanying evse management software), operations, maintenance, and reporting. Sites must be new direct current fast charging (dcfc) electric vehicle (ev) charging stations.
Posted Date
Dec 2, 2025
Due Date
Feb 5, 2026
Release: Dec 2, 2025
Close: Feb 5, 2026
Provide turnkey services for electric vehicle supply equipment (evse), include design, purchasing, construction, installation of hardware (and accompanying evse management software), operations, maintenance, and reporting. Sites must be new direct current fast charging (dcfc) electric vehicle (ev) charging stations.
AvailableThe Arizona Department of Transportation is seeking bids to build, upgrade, operate, and maintain 34 electric vehicle rapid-charging stations along interstates, US routes, and state routes as part of Phase 2 of its statewide EV charging network. Proposals are due Jan. 16, 2026; construction is expected to begin in 2027 and federal NEVI funding will cover up to 80% of eligible project costs with private developers covering at least 20%.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
The Arizona Department of Transportation is seeking bids to build, upgrade, operate, and maintain 34 electric vehicle rapid-charging stations along interstates, US routes, and state routes as part of Phase 2 of its statewide EV charging network. Proposals are due Jan. 16, 2026; construction is expected to begin in 2027 and federal NEVI funding will cover up to 80% of eligible project costs with private developers covering at least 20%.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis