Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes removal and replacement of the existing heat pump system serving the lee theatre dressing room area.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Removal and replacement of four (4) HVAC units at the City of Town Center Data Room.
Posted Date
Dec 16, 2025
Due Date
Jan 13, 2026
Release: Dec 16, 2025
Close: Jan 13, 2026
Removal and replacement of four (4) HVAC units at the City of Town Center Data Room.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes removal of the existing metal roof, inspection and repair of roof purlins as needed, and installation of a new 24-gauge metal roofing system, including wall flashings, wall cap, vented ridge system, and proper disposal of all debris.s.
Posted Date
Jan 7, 2026
Due Date
Jan 16, 2026
Release: Jan 7, 2026
Close: Jan 16, 2026
Work includes removal of the existing metal roof, inspection and repair of roof purlins as needed, and installation of a new 24-gauge metal roofing system, including wall flashings, wall cap, vented ridge system, and proper disposal of all debris.s.
AvailableHvac replacement
Posted Date
Nov 25, 2025
Due Date
Jan 27, 2026
Release: Nov 25, 2025
Close: Jan 27, 2026
Hvac replacement
AvailableReplacement of the HVAC system. Work include remove and replace the existing non-functioning 12.5-ton gas HVAC unit, Furnish and install one (1) 12.5-ton gas packaged unit with economizer (including crane service), furnish and install one (1) new fused safety disconnect with new fuses, fabricate and install a new curb adaptor, furnish and install one (1) new gas flex with a safety shut-off valve, furnish and install necessary condensate piping to the nearest roof drain. See attached file
Posted Date
Dec 5, 2025
Due Date
Jan 9, 2026
Release: Dec 5, 2025
Close: Jan 9, 2026
Replacement of the HVAC system. Work include remove and replace the existing non-functioning 12.5-ton gas HVAC unit, Furnish and install one (1) 12.5-ton gas packaged unit with economizer (including crane service), furnish and install one (1) new fused safety disconnect with new fuses, fabricate and install a new curb adaptor, furnish and install one (1) new gas flex with a safety shut-off valve, furnish and install necessary condensate piping to the nearest roof drain. See attached file
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →