Summary
Work includes clearing & grubbing; dewatering; water main removal including concrete encasement; excavation; 4 EA of 8" ductile iron mechanical joint 45 degree bend w/ joint restraints, polywrapped; 141 LF of 8" pvc c-900 water main w/ retrained joints, including cut-in-sleeves; 8" resilient wedge gate valve & box, polywrapped; hydrant assembly, including hydrant, valve, anchor couplings, tee on main valve box; sealing of concrete surfaces; 360 SQYD of install 4" thick concrete sidewalk, including saw cutting, mesh & dowelsinstall 4" thick concrete sidewalk, including saw cutting, mesh & dowels install 4" thick concrete sidewalk.