Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Leasing the aircraft hangar.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Lease hangar space for state aircraft in Wasilla, Alaska.
Posted Date
Jan 7, 2026
Due Date
Jan 28, 2026
Release: Jan 7, 2026
Close: Jan 28, 2026
Lease hangar space for state aircraft in Wasilla, Alaska.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
RFP seeks aviation-related businesses to lease a 2,912 sq. ft. hangar at Stanhope Municipal Airport for operations including aircraft maintenance, flight training, charter services, aerial work, or aviation parts/services.
Posted Date
-
Due Date
Feb 2, 2026
Close: Feb 2, 2026
RFP seeks aviation-related businesses to lease a 2,912 sq. ft. hangar at Stanhope Municipal Airport for operations including aircraft maintenance, flight training, charter services, aerial work, or aviation parts/services.
AvailableConstruction of Aircraft Maintenance Hangar - Construct a medium standard design Aircraft Maintenance Hangar for rotary wing aircraft. The project will include an aircraft hangar, associated maintenance shops, shop administration area, maintenance support area, Tech Supply and Parts Storage, Aviation Life Support Equipment (ALSE) Shop, Maintenance Company Headquarters, a hazardous materials storage building, POL Storage building, Ground Support Equipment (GSE)covered storage, Associated Support Items of Equipment(ASIOE)covered storage, hangar access apron, aircraft washing apron, cyber security, information systems, fire protection and alarm systems, Closed Circuit Television (CCTV),Intrusion Detection System (IDS)installation, and Energy Monitoring Control Systems (EMCS) connection. Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, landscaping and signage. Heating and air conditioning will be provided by a selfcontained system.
Posted Date
Nov 24, 2025
Due Date
Jul 2, 2026
Release: Nov 24, 2025
Close: Jul 2, 2026
Construction of Aircraft Maintenance Hangar - Construct a medium standard design Aircraft Maintenance Hangar for rotary wing aircraft. The project will include an aircraft hangar, associated maintenance shops, shop administration area, maintenance support area, Tech Supply and Parts Storage, Aviation Life Support Equipment (ALSE) Shop, Maintenance Company Headquarters, a hazardous materials storage building, POL Storage building, Ground Support Equipment (GSE)covered storage, Associated Support Items of Equipment(ASIOE)covered storage, hangar access apron, aircraft washing apron, cyber security, information systems, fire protection and alarm systems, Closed Circuit Television (CCTV),Intrusion Detection System (IDS)installation, and Energy Monitoring Control Systems (EMCS) connection. Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, landscaping and signage. Heating and air conditioning will be provided by a selfcontained system.
AvailableConstructs a multi-story concrete masonry unit (cmu) and metal panel construction building on pile foundation with reinforced concrete slab, structural steel framing, reinforced masonry walls, brick veneer, and standing seam metal roof. The new building will be an f-35b joint strike fighter (jsf) training squadron and legacy compliant aircraft maintenance hangar consisting of high bay space, crew and equipment space, administrative space, and data network areas.
Posted Date
Dec 22, 2025
Due Date
Feb 5, 2026
Release: Dec 22, 2025
Close: Feb 5, 2026
Constructs a multi-story concrete masonry unit (cmu) and metal panel construction building on pile foundation with reinforced concrete slab, structural steel framing, reinforced masonry walls, brick veneer, and standing seam metal roof. The new building will be an f-35b joint strike fighter (jsf) training squadron and legacy compliant aircraft maintenance hangar consisting of high bay space, crew and equipment space, administrative space, and data network areas.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →