Pocono Township
Learn Road Roundabout Project.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Pocono Township
Construction of a vehicular roundabout and will include the following as shown on the construction Plan: Project mobilization and demobilization of all necessary construction/project equipment and/or temporary structures. Installation, maintenance, and removal of traffic control signage. Installation, maintenance, and removal of erosion and sedimentation controls as shown on the Construction Plans. Sawcut and remove existing asphalt road surface. Utility poles will be relocated by others. Existing and new utility poles shall be protected as noted on the Plan. Remove existing trees. Existing trees to remain shall be protected as noted on the Plan. Remove existing boulders. Relocated existing propane tank. Construct roundabout with concrete truck apron with mountable curb and concrete splitter islands with mountable curb. Install storm sewer and inlets. Install new pavement including aggregate subbase, and binder and wearing courses. Install bituminous rolled curb. Install guiderail. Furnish and place topsoil, and fine grade, seed and mulch all disturbed areas. Install landscaping, signage, and pavement markings.
Posted Date
Nov 18, 2025
Due Date
Dec 10, 2025
Release: Nov 18, 2025
Pocono Township
Close: Dec 10, 2025
Construction of a vehicular roundabout and will include the following as shown on the construction Plan: Project mobilization and demobilization of all necessary construction/project equipment and/or temporary structures. Installation, maintenance, and removal of traffic control signage. Installation, maintenance, and removal of erosion and sedimentation controls as shown on the Construction Plans. Sawcut and remove existing asphalt road surface. Utility poles will be relocated by others. Existing and new utility poles shall be protected as noted on the Plan. Remove existing trees. Existing trees to remain shall be protected as noted on the Plan. Remove existing boulders. Relocated existing propane tank. Construct roundabout with concrete truck apron with mountable curb and concrete splitter islands with mountable curb. Install storm sewer and inlets. Install new pavement including aggregate subbase, and binder and wearing courses. Install bituminous rolled curb. Install guiderail. Furnish and place topsoil, and fine grade, seed and mulch all disturbed areas. Install landscaping, signage, and pavement markings.
AvailableCity of Orange City
Work consists of converting existing two-way stop-controlled intersections to a single lane roundabout, milling and resurfacing, concrete curb, lane-splitters and center island, extending existing sidewalk on the west side of avenue south through the south and west leg of the roundabout and relocating the existing water main and force main to accommodate the roadway improvement.
Posted Date
Nov 16, 2025
Due Date
Dec 18, 2025
Release: Nov 16, 2025
City of Orange City
Close: Dec 18, 2025
Work consists of converting existing two-way stop-controlled intersections to a single lane roundabout, milling and resurfacing, concrete curb, lane-splitters and center island, extending existing sidewalk on the west side of avenue south through the south and west leg of the roundabout and relocating the existing water main and force main to accommodate the roadway improvement.
AvailableCity of Fishers
Roundabout Construction at the intersection.
Posted Date
Nov 5, 2025
Due Date
Dec 3, 2025
Release: Nov 5, 2025
City of Fishers
Close: Dec 3, 2025
Roundabout Construction at the intersection.
AvailableOneida County
Oneida County is soliciting bids to construct a 2βlane roundabout at the intersection of NYS Route 825 and Perimeter Road in Rome, NY, as part of the Griffiss International Airport Triangle Development. The project includes pavement reconstruction, storm drainage, detour lighting, precast walls, street lighting, utilities, parking, sidewalks, trail, signage, pavement markings, and landscaping.
Posted Date
-
Due Date
Dec 12, 2025
Oneida County
Close: Dec 12, 2025
Oneida County is soliciting bids to construct a 2βlane roundabout at the intersection of NYS Route 825 and Perimeter Road in Rome, NY, as part of the Griffiss International Airport Triangle Development. The project includes pavement reconstruction, storm drainage, detour lighting, precast walls, street lighting, utilities, parking, sidewalks, trail, signage, pavement markings, and landscaping.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis