Summary
Work includes 180 TON subbase, special backfill - gr 30 (3/4" dense base pile); 3,750 TON replacement of unsuitable backfill material, gr 30, (modified subbase pile); 9,200 LF water service stubs, pipe, copper, 3/4"; 95 EA water service stubs, corporation, 3/4"; 95 EA water service stubs, curb stop and box, 3/4"; 500 SY removal of sidewalk; 200 SY removal of driveway; 500 SY pcc, sidewalk, 5" (thickness); 150 SY driveway, paved, pcc, 6" (thickness); 50 SY driveway, paved, hma, 6" (thickness); 50 ton driveway, granular by ton; 500 SY full depth patches pcc; 2,500 SY full depth patches hma. / see attached file.