Summary
Installation of new controls with programming, back-up generator with ATS, chain-link fencing, safety grate, and pump lift/hoist for an existing lift station. Removal of existing sewer force main and installation of approx. 60 LF of new force main, one (1) bypass tee, and two (2) gate valves with box. Removal of existing Air Release Valves (ARVs) and installation of five (5) combination air release valves. Provision of two (2) spare ARVs. Removal of existing concrete manhole structure and installation of one (1) concrete manhole structure with bypass apparatus. Installation of insulation over existing force main.