Muhlenberg Township Water and Sewer Authority
Work includes supplying all labor, equipment, and materials for the removal 120 feet of water main pipe in laurel run (muhlenberg twp), capping and abandoning in place the remaining pipe, backfill and spread gravel bar evenly over removed pipe, remove 10 feet of existing terracotta sanitary sewer main and replace it with ductile iron pipe (dip), and stream bank restoration with r-6 rock lining.
Laurel Run Waterline Pipe Removal and Sanitary Sewer Repair Project
zip
Release
Apr 25, 2025
Close
May 08, 2025