Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Schedule A - Lakewood Villas Mobile Home Park water main replacement: Install approx. 500 LF of 8" DI water main to replace existing; install a new 4" water meter and meter vault; and replace 1-1/2" water meter. Schedule B - Plywood Supply Company side sewer modification and manhole installation: Provide bypass pumping; install new manhole; install 6" PVC sewer pipe to connect existing side sewer to new manhole; and restore asphalt. Schedule C (optional, pending final permit requirements) - Full-width asphalt planing and overlay of the park's main driveway.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Walhalla is soliciting bids for the Water & Sewer Improvements Project - Division IV, which includes installing approximately 3,600 linear feet of 10-inch water lines in the Poplar Springs Road area and related work. The project is to be delivered using Design-Bid-Build; bid documents are available from Summit Engineering Group for a non-refundable fee of $150 per set. Bids are due December 18, 2025 at 2:00 PM local time and questions should be emailed to the project coordinator prior to the bid opening.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
The City of Walhalla is soliciting bids for the Water & Sewer Improvements Project - Division IV, which includes installing approximately 3,600 linear feet of 10-inch water lines in the Poplar Springs Road area and related work. The project is to be delivered using Design-Bid-Build; bid documents are available from Summit Engineering Group for a non-refundable fee of $150 per set. Bids are due December 18, 2025 at 2:00 PM local time and questions should be emailed to the project coordinator prior to the bid opening.
AvailableWater, Sewer, Drainage and Paving Improvements.
Posted Date
Dec 2, 2025
Due Date
Dec 16, 2025
Release: Dec 2, 2025
Close: Dec 16, 2025
Water, Sewer, Drainage and Paving Improvements.
2022 Sanitary Sewer Improvements Contract No. 5 - Sanitary Sewer Improvements.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Close: Dec 16, 2025
2022 Sanitary Sewer Improvements Contract No. 5 - Sanitary Sewer Improvements.
Construction of the Water Distribution System, Sanitary Sewer System, Streets, Water Quality and Drainage Improvements
Posted Date
Dec 11, 2025
Due Date
Jan 8, 2026
Release: Dec 11, 2025
Close: Jan 8, 2026
Construction of the Water Distribution System, Sanitary Sewer System, Streets, Water Quality and Drainage Improvements
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis