Summary
Construct tenant improvement of the shelled level 2 floor plate within an existing two-story building. Work includes minor demolition of walls to accommodate the reconfigured space, as well as new casework, lighting, and finishes throughout, along with mechanical, electrical, and plumbing systems to support a new primary care clinic with exam, treatment, office, and support spaces. The project will be phased to support continuous operation of the existing clinic on the first floor. The first phase will consist of the level 2 clinic build-out, including the blood lab and entry stair. This phase must be fully operational before the second phase begins, with a 60-day period between phase 1 substantial completion and the start of phase 2 to allow for owner move-in and go-live activities. The second phase will include reconfiguration of the existing level 1 blood lab and specimen toilet into an expanded reception and work area.