Summary
The project includes: A.UTILITIES: 1. Stormwater: a. Approx. 800’ of 18” Storm Culvert with Inlet/Outlet Protection. b. Approx. 120’ of 24” Storm Culvert with Inlet/Outlet Protection. 2. Water. a. Approx. 2400’ of 8” Water Line with misc. appurtenances and fittings. b. Approx. 220’ of 6” Water Line with misc. appurtenances and fittings. c. Approx. 2800’ of 2” Water Line with misc. appurtenances and fittings. d. Approx. 960’ of 3/4” Water Line with misc. appurtenances and fittings. e. Other misc. water pipe, fittings, and appurtenances. 3. Sewer. a. Approx. 2200’ of 8” Sewer Line with manholes and fittings. b. Approx. 680’ of 6” Sewer Line and fittings. 4. Electrical. a. Additional sleeves under paving for Future Package to use B.Paving. 1. Street A. a. Approx. 6500 SY of 8” Paving and Flexbase. b. Approx. 350 SY of 6” Paving and Flexbase. 2. Steet B: a. Approx. 2500 SY of 8” Paving and Flexbase. b. Approx. 350 SY of 5” Paving and Flexbase. c. Approx. 275 SY of 6” Paving and Flexbase. 3. Trail: a. Granite Trail – Approx. 18000 sqft. b. Paving Trail – Approx. 27000 sqft. C. Restoration – Approx. ~40 acres.