Summary
The City of Brookhaven seeks bids for construction of an approximately 8‑foot‑wide multi‑use sidepath to replace about 450 linear feet of existing sidewalk along the north side of Lake Hearn Drive between Perimeter Center Parkway and the first driveway to the west. Work includes demolition and disposal of existing sidewalk, coordination with Georgia Power to relocate decorative pedestrian streetlights, grading and compaction, forming and pouring the new concrete sidepath, curb/gutter/ADA ramp touch‑up as needed, and sod restoration. The project is being procured as ITB 26‑105 with a pre‑bid meeting and a published submission deadline.