Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This Project provides for improvements along approx. 1,020 LF of Dam. Work includes Mobilization; Traffic Control - barricades, signs, traffic detours, etc.; SW3P - preparation, maintenance, and removal; Construction Materials Testing; Prepare Right-of-Way; Design, Engineer, and Construct Temporary Special Shoring; Primary Spillway Structure - Install Concrete Box Culverts (5'x5'), reinforced concrete intake structure, reinforced concrete wingwall structure; Construct Filter Diaphragm; Excavate Proposed Outfall Ditch; Install 12" Stone Rip Rap; Remove Existing Service & Emergency Spillways - all components in their entirety; Re-Grade Existing Outfall Ditch; Install Vegetated Geotextile; Excavate and/or Mill and Remove 12" of Existing Asphalt & Flex Base; Excavation; Embankment/Placement of Structural Fills; Proof Rolling; 6" Crushed Limestone Base (Type A, Grade 1-2); Asphaltic Prime Coat (0.20 gal/sy); 2" Hot-Mix Asphalt Concrete (Type D); Small Roadside Sign Assembly Installation; Pavement Striping and Reflectors; Permanent Hydromulch Seeding.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project involves the construction of improvements to Griffith Lake Dam located in Kent and Sussex Counties. The improvements include, but are not limited to _Demolition/removal of the existing spillway and the north and south abutment training walls; construction of new pile supported cast-in-place concrete spillway, runout apron, outlet structure and abutment walls; installation of a galvanized steel bar screen trash rack and a multi-leaf self-contained stainless steel weir gate and associated site work.
Posted Date
Nov 10, 2025
Due Date
Jan 21, 2026
Release: Nov 10, 2025
Close: Jan 21, 2026
Project involves the construction of improvements to Griffith Lake Dam located in Kent and Sussex Counties. The improvements include, but are not limited to _Demolition/removal of the existing spillway and the north and south abutment training walls; construction of new pile supported cast-in-place concrete spillway, runout apron, outlet structure and abutment walls; installation of a galvanized steel bar screen trash rack and a multi-leaf self-contained stainless steel weir gate and associated site work.
AvailableConstruction of improvements to Griffith Lake Dam, including demolition and removal of existing spillway and abutment walls, construction of a new pile-supported concrete spillway, runout apron, outlet structure, and abutment walls, and installation of a trash rack and weir gate, plus associated site work.
Posted Date
-
Due Date
Jan 21, 2026
Close: Jan 21, 2026
Construction of improvements to Griffith Lake Dam, including demolition and removal of existing spillway and abutment walls, construction of a new pile-supported concrete spillway, runout apron, outlet structure, and abutment walls, and installation of a trash rack and weir gate, plus associated site work.
The project involves rehabilitation of the dam and includes the following major components: clearing and grubbing of the project area. Installation of care of water measures (cofferdams, diversions, etc. ) as necessary to protect the work and facilitate construction. Construction of access road along the downstream toe. Topsoil and seed all areas disturbed by construction activities.
Posted Date
Dec 3, 2025
Due Date
Jan 6, 2026
Release: Dec 3, 2025
Close: Jan 6, 2026
The project involves rehabilitation of the dam and includes the following major components: clearing and grubbing of the project area. Installation of care of water measures (cofferdams, diversions, etc. ) as necessary to protect the work and facilitate construction. Construction of access road along the downstream toe. Topsoil and seed all areas disturbed by construction activities.
The U.S. Army Corps of Engineers, New England District is issuing a pre-solicitation for snow removal and sanding services at Birch Hill Dam and Tully Lake in Royalston, MA, requiring the contractor to provide all necessary equipment, materials, labor, and transportation. This solicitation is a total small business set-aside and will be posted on SAM.gov on or about December 11, 2025. Vendors must have active SAM.gov registration to submit proposals.
Posted Date
Nov 25, 2025
Due Date
Dec 20, 2025
Release: Nov 25, 2025
Close: Dec 20, 2025
The U.S. Army Corps of Engineers, New England District is issuing a pre-solicitation for snow removal and sanding services at Birch Hill Dam and Tully Lake in Royalston, MA, requiring the contractor to provide all necessary equipment, materials, labor, and transportation. This solicitation is a total small business set-aside and will be posted on SAM.gov on or about December 11, 2025. Vendors must have active SAM.gov registration to submit proposals.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis