The Illinois Department of Natural Resources (DNR), through its Office of Coastal Zone Management Program, has issued an emergency procurement (Bid #26-422DNR-COSTZ-B-51762) for repairs to an asphalt trail and interior park road at Adeline Jay Geo-Karis Illinois Beach State Park. The emergency procurement was triggered when first responders were delayed during a recent emergency response at the beach because an ambulance became mired in a mosaic of soft and hard materials along a significantly deteriorated road. The work involves construction services including backfill, ditching, road grading, and rock stabilization to restore safe and functional road conditions at the park.
The City of Raleigh is soliciting construction bids for the Lake Lynn West Loop Trail Improvements, which include replacement of the asphalt greenway, widening the trail with gravel shoulders, slight realignment, and replacement/raising of the timber boardwalk through the lake. Bidders must be licensed to perform the work in North Carolina, a 5% bid security is required, and the City has an aspirational 15% MWBE participation goal; bidding documents are available by request (per the solicitation). The solicitation is an Invitation for Bid with a pre-bid meeting scheduled and a hard-copy submission requirement listed in the posting.
The City of Raleigh is soliciting construction bids for the Lake Lynn West Loop Trail Improvements, which include replacement of the asphalt greenway, widening the trail with gravel shoulders, slight realignment, and replacement/raising of the timber boardwalk through the lake. Bidders must be licensed to perform the work in North Carolina, a 5% bid security is required, and the City has an aspirational 15% MWBE participation goal; bidding documents are available by request (per the solicitation). The solicitation is an Invitation for Bid with a pre-bid meeting scheduled and a hard-copy submission requirement listed in the posting.
The Illinois Department of Natural Resources (DNR), through its Office of Coastal Zone Management Program, has issued an emergency procurement (Bid #26-422DNR-COSTZ-B-51762) for repairs to an asphalt trail and interior park road at Adeline Jay Geo-Karis Illinois Beach State Park. The emergency procurement was triggered when first responders were delayed during a recent emergency response at the beach because an ambulance became mired in a mosaic of soft and hard materials along a significantly deteriorated road. The work involves construction services including backfill, ditching, road grading, and rock stabilization to restore safe and functional road conditions at the park.
The Illinois Department of Natural Resources (DNR), through its Office of Coastal Zone Management Program, has issued an emergency procurement (Bid #26-422DNR-COSTZ-B-51762) for repairs to an asphalt trail and interior park road at Adeline Jay Geo-Karis Illinois Beach State Park. The emergency procurement was triggered when first responders were delayed during a recent emergency response at the beach because an ambulance became mired in a mosaic of soft and hard materials along a significantly deteriorated road. The work involves construction services including backfill, ditching, road grading, and rock stabilization to restore safe and functional road conditions at the park.
The Illinois Department of Natural Resources (DNR), through its Office of Coastal Zone Management Program, has issued an emergency procurement (Bid #26-422DNR-COSTZ-B-51762) for repairs to an asphalt trail and interior park road at Adeline Jay Geo-Karis Illinois Beach State Park. The emergency procurement was triggered when first responders were delayed during a recent emergency response at the beach because an ambulance became mired in a mosaic of soft and hard materials along a significantly deteriorated road. The work involves construction services including backfill, ditching, road grading, and rock stabilization to restore safe and functional road conditions at the park.