Summary
Lagoon Upgrade Project 1. Objective Upgrade the existing wastewater lagoon system to improve aeration efficiency, optimize retention time, and enhance overall treatment performance. 2. Contractor-Furnished Equipment (CFE) The General Contractor (GC) shall procure, deliver, install, and warrant the following primary mechanical components: Underwater Aeration System: One (1) complete submerged aeration assembly. Aeration Blowers: Two (2) new high-efficiency air blowers matching system duty requirements. Lagoon Baffle: One (1) new floating or fixed hydraulic baffle wall partition. 3. General Contractor Civil & Structural Scope The GC is fully responsible for all turnkey civil works, including: Concrete Works: Engineering, forming, pouring, and curing of all equipment pads, structural anchors, and thrust blocks. Piping & Integration: Supply and installation of all air headers, process piping, valves, fittings, and connections from blowers to the aeration system. Site Preparation: Dewatering, sludge management, excavation, trenching, and backfilling required for piping and anchors. Testing & Commissioning: Hydrostatic testing of lines, structural integrity checks, and full system start-up testing. 4. Project Schedule & Milestones Final Completion Deadline: All installation, testing, and cleanup work must be fully completed by December 31, 2026.