Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Springfield, Ohio invites electronic proposals for the Lagonda Ave and Columbus Ave Water Service Replacement project. Bids are submitted via Bid Express (Bid Number 26-03) with a virtual bid opening, and the project is funded by the Ohio Environmental Protection Agency with Davis‑Bacon wage requirements. The engineer’s estimate is approximately $1.84 million and all proposals must comply with the City’s specifications and instructions to bidders.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Missoula is issuing an Invitation to Bid for the North Avenue – Bancroft to Higgins Water Main Replacement Project to replace and install approximately 2,305 LF of 8-inch DIP, 116 LF of 6-inch DIP, and 160 LF of bored 10-inch HDPE water main and associated services, hydrants, valves, and restorations. Contract documents and half-size drawings are available through QuestCDN (project number 9978046) beginning December 13, 2025; bidders must purchase documents via QuestCDN and submit electronic bids through QuestCDN or the City bidding site. Bids are due January 14, 2026 at 2:00 p.m. MST (2026-01-14T21:00:00Z), and a mandatory virtual pre-bid conference is scheduled for January 6, 2026 at 3:00 p.m. MST.
Posted Date
Dec 9, 2025
Due Date
Jan 14, 2026
Release: Dec 9, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 14, 2026
The City of Missoula is issuing an Invitation to Bid for the North Avenue – Bancroft to Higgins Water Main Replacement Project to replace and install approximately 2,305 LF of 8-inch DIP, 116 LF of 6-inch DIP, and 160 LF of bored 10-inch HDPE water main and associated services, hydrants, valves, and restorations. Contract documents and half-size drawings are available through QuestCDN (project number 9978046) beginning December 13, 2025; bidders must purchase documents via QuestCDN and submit electronic bids through QuestCDN or the City bidding site. Bids are due January 14, 2026 at 2:00 p.m. MST (2026-01-14T21:00:00Z), and a mandatory virtual pre-bid conference is scheduled for January 6, 2026 at 3:00 p.m. MST.
AvailableThe City of Bend invites sealed bids for the Galveston Ave. Pressure Reducing Valve Replacement Project to install a new 6-inch pressure reducing valve (PRV) in a precast utility vault and connect it to the existing water system with ~150 linear feet of 8-inch ductile iron main. Work includes reconfiguration of existing piping and valves at NW 17th Street and Galveston Ave, plus surface restoration (2-inch grind and inlay ~455 sq yd) and necessary traffic/erosion control. The project is an ITB (construction) with performance to begin upon NTP (no later than 2026-03-02) and completion by 2026-06-19.
Posted Date
Dec 8, 2025
Due Date
Jan 8, 2026
Release: Dec 8, 2025
Close: Jan 8, 2026
The City of Bend invites sealed bids for the Galveston Ave. Pressure Reducing Valve Replacement Project to install a new 6-inch pressure reducing valve (PRV) in a precast utility vault and connect it to the existing water system with ~150 linear feet of 8-inch ductile iron main. Work includes reconfiguration of existing piping and valves at NW 17th Street and Galveston Ave, plus surface restoration (2-inch grind and inlay ~455 sq yd) and necessary traffic/erosion control. The project is an ITB (construction) with performance to begin upon NTP (no later than 2026-03-02) and completion by 2026-06-19.
AvailableConstruction of pedestrian and traffic signalization, ADA ramps, sidewalks, and striping at Lobdell Ave / Goodwood Blvd and Lobdell Ave / Seven Oaks Ave intersections.
Posted Date
-
Due Date
Jan 22, 2026
Close: Jan 22, 2026
Construction of pedestrian and traffic signalization, ADA ramps, sidewalks, and striping at Lobdell Ave / Goodwood Blvd and Lobdell Ave / Seven Oaks Ave intersections.
AvailableConstruction of the Galveston Ave. Pressure Reducing Valve Replacement Project. The work includes installation of a new 6" pressure reducing valve (PRV) within a precast utility vault, along with all associated piping, fittings, and ancillary valves required for proper operation. The new vault will be connected to the existing water system through approx. 150 LF of 8" ductile iron water main with restrained joints. The scope also includes reconfiguration of existing piping and valves in the intersection of NW 17th Street and Galveston Avenue as necessary to integrate and ensure proper operation of the new PRV. Surface restoration will include a 2" grind and inlay of approx. 455 SY of asphalt pavement and any necessary curb replacement. Traffic control and erosion control are required as part of the work.
Posted Date
Dec 3, 2025
Due Date
Jan 8, 2026
Release: Dec 3, 2025
Close: Jan 8, 2026
Construction of the Galveston Ave. Pressure Reducing Valve Replacement Project. The work includes installation of a new 6" pressure reducing valve (PRV) within a precast utility vault, along with all associated piping, fittings, and ancillary valves required for proper operation. The new vault will be connected to the existing water system through approx. 150 LF of 8" ductile iron water main with restrained joints. The scope also includes reconfiguration of existing piping and valves in the intersection of NW 17th Street and Galveston Avenue as necessary to integrate and ensure proper operation of the new PRV. Surface restoration will include a 2" grind and inlay of approx. 455 SY of asphalt pavement and any necessary curb replacement. Traffic control and erosion control are required as part of the work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →