Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Labor only to replace the floor boards on the bridge over the pond at the park. 100' long x 14' wide.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide construct stream bridge to replace NRP-03.
Posted Date
Dec 4, 2025
Due Date
Jan 14, 2026
Release: Dec 4, 2025
Close: Jan 14, 2026
Provide construct stream bridge to replace NRP-03.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Bridge joint replacement, structural steel repairs, floor drain extension, and deck sealer. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
Bridge joint replacement, structural steel repairs, floor drain extension, and deck sealer. See outside link.
AvailableApprox. 1,230 CY Earth excavation; 68 P nitrogen fertilizer nutrient; 555 SY erosion control blanket; 286 ft perimeter erosion barrier; 3,830 P bituminous materials (prime coat); 346 P bituminous materials (tack coat); 349.900 CY concrete structures; 1 LS clearing and grubbing; 1,690 SF precast bridge approach slab. See outside link.
Posted Date
Mar 28, 2022
Due Date
Jan 16, 2026
Release: Mar 28, 2022
Close: Jan 16, 2026
Approx. 1,230 CY Earth excavation; 68 P nitrogen fertilizer nutrient; 555 SY erosion control blanket; 286 ft perimeter erosion barrier; 3,830 P bituminous materials (prime coat); 346 P bituminous materials (tack coat); 349.900 CY concrete structures; 1 LS clearing and grubbing; 1,690 SF precast bridge approach slab. See outside link.
AvailableWork includes 8 EA bridge repair remove and replace timer cap; 9 EA bridge repair remove and replace timer stringer; 16 EA bridge repair remove and replace timer pile; 23,210 SF bridge repair remove and replace timer decking with composite decking; 3,832 bridge repair remove and replace timer rail cap with composite rail cap; 14,500 LF bridge repair remove and replace timer railing with treated railing.
Posted Date
-
Due Date
Feb 10, 2026
Release: -
Close: Feb 10, 2026
Work includes 8 EA bridge repair remove and replace timer cap; 9 EA bridge repair remove and replace timer stringer; 16 EA bridge repair remove and replace timer pile; 23,210 SF bridge repair remove and replace timer decking with composite decking; 3,832 bridge repair remove and replace timer rail cap with composite rail cap; 14,500 LF bridge repair remove and replace timer railing with treated railing.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →