Summary
1. The contractor will furnish all materials, equipment, supervision, and personnel necessary to accomplish the project as indicated above. 2. Demolition and replacement of the existing fridge/freezer components shall be included with the exception of the walk-in insulated panels. 3. Removal of current condensing units, evaporators, and line sets. This is not an all-encompassed list. (a crane may be needed for the removal and installation of the condensing units). 4. Installation should include but not limited to new condensing units, evaporators, and line sets for each individual walk-in system. 5. Installation of all necessary electrical controls, including thermostats, defrost controls, fan controls, safety switches, and associated wiring required for the proper operation of each independent refrigeration system. This is not an all-encompassed list. See attached file.