Summary
The Cullman City Board of Education is soliciting sealed bids from qualified general contractors for the construction of a new parking lot at Cullman Middle School. The project scope includes selective demolition and new construction, including site work, single-level concrete block wall construction with brick veneer, aluminum windows and storefront system, standing seam roof on composite deck over a pre-engineered structural metal frame, interior finishes, kitchen equipment, and all required plumbing, mechanical, and electrical work. The architect for the project is Lathan McKee Architects, and all work must be complete and ready for owner occupancy within ninety (90) consecutive calendar days from the written Notice to Proceed.