Retrieving RFP details
Release
Close
Kaiser Permanente
Project consist of replace 4 roof top units (rtu) - rtu-east, rtu-west, rtu-administration, and rtu-conference which are near the end of their useful lives and utilize r-22 refrigerant, which is becoming more difficult and more expensive to maintain. See outside link.
City of Norwalk
Work consists of replacement of the roof top units (RTU).
U.S. Army Engineer District Huntington
Design-Build. Provide roof and RTU replacement. Building envelope, roof repair and replacement construction.
Augusta County
Replace a 10 ton gas/electric roof top unit (RTU) located at the county sheriffs office. Purchase and install the new unit as well as, remove and dispose of the existing unit.
Meramec Valley School District R-3
PHS Auditorium RTU Replacements.
Release
Jan 09, 2025
Close
Feb 10, 2025