Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Basketball Court Improvements, contains one (1) contract: Contract No. 1 – Site Improvement Contract. Including 376 SF concrete pavement at beanches; 624 SF concrete pavement at bleachers; 2,160 SY basketball court pavement overlay; 320 SY basket court pavement; 2,480 SY basketball court color coat and lines; 212 LF basketball court fencing; 230 SY bituminous trail pavement; 140 LF underdrain. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Ork includes the preparation and construction of a full basketball court; pick up, transport, and installation of district-procured basketball standards. The project also includes other site related work such as demolition of concrete, clearing and grubbing, site layout and staking, rough and finish grading, temporary construction fencing, relocation of two existing concrete benches, new trash receptacle, new concrete paving and mowbands, sleeves under paving, existing irrigation system adjustments and new improvements, new drain sump, turf repair, and other minor site work.
Posted Date
Dec 19, 2025
Due Date
Jan 20, 2026
Release: Dec 19, 2025
Close: Jan 20, 2026
Ork includes the preparation and construction of a full basketball court; pick up, transport, and installation of district-procured basketball standards. The project also includes other site related work such as demolition of concrete, clearing and grubbing, site layout and staking, rough and finish grading, temporary construction fencing, relocation of two existing concrete benches, new trash receptacle, new concrete paving and mowbands, sleeves under paving, existing irrigation system adjustments and new improvements, new drain sump, turf repair, and other minor site work.
AvailableThe Town of Irmo seeks a design-build construction firm to construct a basketball court at Rawl’s Creek Park (1113 Friarsgate Blvd, Irmo, SC). The solicitation is posted in SCBO and directs vendors to the Town’s official bid page for the full RFQ. Proposals are due January 16, 2026 at 2:00 pm local time.
Posted Date
-
Due Date
Jan 16, 2026
Release: -
Close: Jan 16, 2026
The Town of Irmo seeks a design-build construction firm to construct a basketball court at Rawl’s Creek Park (1113 Friarsgate Blvd, Irmo, SC). The solicitation is posted in SCBO and directs vendors to the Town’s official bid page for the full RFQ. Proposals are due January 16, 2026 at 2:00 pm local time.
The Project consists of dredging the existing pond and forebay, and construction of a new fiberglass pedestrian bridge, storm sewer system, sidewalk, concrete curb and gutter, asphalt paving, signage and marking, and landscaping and other necessary associated work and materials necessary for the completion of the project.
Posted Date
Dec 2, 2025
Due Date
Jan 20, 2026
Release: Dec 2, 2025
Close: Jan 20, 2026
The Project consists of dredging the existing pond and forebay, and construction of a new fiberglass pedestrian bridge, storm sewer system, sidewalk, concrete curb and gutter, asphalt paving, signage and marking, and landscaping and other necessary associated work and materials necessary for the completion of the project.
AvailableImprovements to include the fenced dog park and splash pond; basketball court; bocce ball court; athletic field and play areas; pavilion; emergency services cot storage facility; a walking trail and sidewalk; parking lot expansion; and other park amenities as specified in the project plans and specifications.
Posted Date
Dec 16, 2025
Due Date
Jan 21, 2026
Release: Dec 16, 2025
Close: Jan 21, 2026
Improvements to include the fenced dog park and splash pond; basketball court; bocce ball court; athletic field and play areas; pavilion; emergency services cot storage facility; a walking trail and sidewalk; parking lot expansion; and other park amenities as specified in the project plans and specifications.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis