Summary
The project includes: Replacements of front and back door and replace best lock. Replacement of flooring with luxury vinyl tile. Replacement of all cabinets in kitchen, restrooms, and utility room. Replacement of all sinks and faucets in restrooms and kitchen. Replacement of all counters. Replacement of furnace with HVAC and install outside condenser and install cement base. Replacement of bathtub with standing shower. Replace crawl space HVAC flexible duct. Replace baseboards. Replace stove vent and duct system. Replace all water plumbing. Remove large tub at one location. Replace utility room subflooring with 3/4" plywood. Install one more layer of cinder block around modular home and replace vent panels. Contractor is to dispose of debris at approved EPA disposal location. KHC to run 220-volt power to AC condenser.