Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
U.S. Army Engineer District Hawaii
Design-bid-build (DBB) project is to dredge and clear two (2) sections of Stream, clean out two (2) existing concrete culverts drainpipes on one section, and an option to replace one of the concrete culverts drainpipes. the major elements of the scope of work include, but are not limited to pre-mobilization activities; compliance with applicable environmental requirements; mobilization which includes preparation of temporary construction staging and dewatering areas; dredging of accumulated sediments; transportation of material according to specified environmental best management practices; testing of dredged material prior to upland disposal; transportation of the dewatered sediments to the pvt landfill as the upland disposal site; and, demobilization which includes the restoration of the temporary construction staging and dewatering areas to their original condition.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Hawaii Department of Human Services
State of Hawaii DHS RFP (SSD-26-POS-9898) for provision and operation of Child Welfare Services (CWS) shelter services covering Oahu, East Hawaii, and Kauai. Solicitation seeks a single award for shelter operations with program-specific staffing, facility, compliance, performance measurement, and budget requirements. Initial contract term runs Dec 28, 2025–June 30, 2031, with up to four one-year extensions. Proposals must be submitted electronically in PDF via the HIePRO system.
Posted Date
Nov 25, 2025
Due Date
Dec 24, 2025
Release: Nov 25, 2025
Hawaii Department of Human Services
Close: Dec 24, 2025
State of Hawaii DHS RFP (SSD-26-POS-9898) for provision and operation of Child Welfare Services (CWS) shelter services covering Oahu, East Hawaii, and Kauai. Solicitation seeks a single award for shelter operations with program-specific staffing, facility, compliance, performance measurement, and budget requirements. Initial contract term runs Dec 28, 2025–June 30, 2031, with up to four one-year extensions. Proposals must be submitted electronically in PDF via the HIePRO system.
AvailableU.S. Army Engineer District Galveston
FY26 Double Bayou Maintenance Dredging.
Posted Date
Dec 2, 2025
Due Date
Jan 6, 2026
Release: Dec 2, 2025
U.S. Army Engineer District Galveston
Close: Jan 6, 2026
FY26 Double Bayou Maintenance Dredging.
AvailableTown of Marshville
The project will consist of dredging and maintaining existing wastewater storage lagoons to restore capacity for use as equalization. The bio-solids quantities that can be removed have been estimated to be as follows: east pond: 712,166 gallons; 5.1% solids for 156 tons dry weight west pond: 1,019,152 gallons; 5.3% solids for 232 tons dry weight additional information and details of sampling is found in appendix A of the bidding package.
Posted Date
Nov 17, 2025
Due Date
Dec 17, 2025
Release: Nov 17, 2025
Town of Marshville
Close: Dec 17, 2025
The project will consist of dredging and maintaining existing wastewater storage lagoons to restore capacity for use as equalization. The bio-solids quantities that can be removed have been estimated to be as follows: east pond: 712,166 gallons; 5.1% solids for 156 tons dry weight west pond: 1,019,152 gallons; 5.3% solids for 232 tons dry weight additional information and details of sampling is found in appendix A of the bidding package.
City of Palm Beach Gardens
Provide dredging, sediment removal, and aquatic vegetation control services for city-owned canals, stormwater retention ponds, and waterways, services will include mechanical and hydraulic dredging, shoreline restoration, sediment transport and disposal, removal of aquatic vegetation and debris, and maintenance of flow and water quality in compliance with environmental standards.
Posted Date
Nov 9, 2025
Due Date
Dec 19, 2025
Release: Nov 9, 2025
City of Palm Beach Gardens
Close: Dec 19, 2025
Provide dredging, sediment removal, and aquatic vegetation control services for city-owned canals, stormwater retention ponds, and waterways, services will include mechanical and hydraulic dredging, shoreline restoration, sediment transport and disposal, removal of aquatic vegetation and debris, and maintenance of flow and water quality in compliance with environmental standards.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis