Summary
Provide qualified professional engineering firms to provide comprehensive design, permitting, bidding, and construction services for park access improvements; paved boat ramp: replacement of the failing launch with a concrete boat ramp designed to handle seasonal ice-shove and high-water velocity; safety grading: mitigation of high-bank obstacles to allow for safer take outs and multi-user staging. Stepped egress to allow paddlers to stage at different water levels with minimum design length of 25' to allow different user groups. ; a stream barb erosion control: implementation of an engineered stream barb extending into the river to redirect high-velocity, erosive crosscurrents away from the launch area. Shoreline protection must incorporate armoring and riprap bank stabilization as designated in the preliminary layouts. See attached file.