Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Jenkins Township Sanitary Authority issued an IFB for the Highland Hills Phase 2 sewer rehabilitation project, which involves select dig‑up repairs and pipe replacement in four manhole sections. The solicitation opened on 2025‑12‑15 and will close on 2026‑01‑06, with a 150‑day performance period after notice to proceed. Bidding documents and specifications are listed on the PennBid/Bonfire page, but direct download links require a login.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Select dig-up repairs and pipe replacement in four (4) manhole sections and related work. rehabilitation of sanitary sewer mains, including but not limited to the following: 1.Excavate and replace portions of sewer mains in 4 manhole sections. 2.Rehabilitation of sanitary sewer mains through installation of new SDR-35 PVC pipe with approved connections to the existing pipe or manhole. 3. Paving and yard restoration. construct the various units, including but not limited to clearing, all types of excavation, trenching, shoring, pumping, pipe embankment, laying and joining pipe, testing, backfilling, repairing leaks, tamping aggregate, planting, clean up and removing surplus materials.
Posted Date
Dec 15, 2025
Due Date
Jan 6, 2026
Release: Dec 15, 2025
Close:
Premium
Access the largest public sector contact database
Select dig-up repairs and pipe replacement in four (4) manhole sections and related work. rehabilitation of sanitary sewer mains, including but not limited to the following: 1.Excavate and replace portions of sewer mains in 4 manhole sections. 2.Rehabilitation of sanitary sewer mains through installation of new SDR-35 PVC pipe with approved connections to the existing pipe or manhole. 3. Paving and yard restoration. construct the various units, including but not limited to clearing, all types of excavation, trenching, shoring, pumping, pipe embankment, laying and joining pipe, testing, backfilling, repairing leaks, tamping aggregate, planting, clean up and removing surplus materials.
AvailableWork generally includes filling and abandoning the existing 8” sanitary sewer and manholes, and installing approx. 3,500 LF of new 8" sanitary sewers, manholes, and additional 6" sanitary services includes driveway removal and patching, pavement patching, curb and gutter removal and replacement, inlet protection, temporary pavement patching, traffic control and protection, and landscape restoration. In addition, the scope includes construction of a new lift station along with associated electrical and civil work.
Posted Date
Nov 17, 2025
Due Date
Dec 19, 2025
Release: Nov 17, 2025
Close: Dec 19, 2025
Work generally includes filling and abandoning the existing 8” sanitary sewer and manholes, and installing approx. 3,500 LF of new 8" sanitary sewers, manholes, and additional 6" sanitary services includes driveway removal and patching, pavement patching, curb and gutter removal and replacement, inlet protection, temporary pavement patching, traffic control and protection, and landscape restoration. In addition, the scope includes construction of a new lift station along with associated electrical and civil work.
Work generally includes filling and abandoning the existing 8” sanitary sewer and manholes, and installing approx. 3,500 LF of new 8" sanitary sewers, manholes, and additional 6" sanitary services includes driveway removal and patching, pavement patching, curb and gutter removal and replacement, inlet protection, temporary pavement patching, traffic control and protection, and landscape restoration. In addition, the scope includes construction of a new lift station along with associated electrical and civil work.
Posted Date
Nov 17, 2025
Due Date
Dec 19, 2025
Release: Nov 17, 2025
Close: Dec 19, 2025
Work generally includes filling and abandoning the existing 8” sanitary sewer and manholes, and installing approx. 3,500 LF of new 8" sanitary sewers, manholes, and additional 6" sanitary services includes driveway removal and patching, pavement patching, curb and gutter removal and replacement, inlet protection, temporary pavement patching, traffic control and protection, and landscape restoration. In addition, the scope includes construction of a new lift station along with associated electrical and civil work.
Work includes 2,450 LF, 12 DIP sanitary sewer (open cut), 532 LF pipe burst existing 8" pipe to 12" HDPE sanitary sewer, 811 LF pipe burst existing 10" pipe to 12" HDPE sanitary sewer, 60 LF 24" steel casing (open cut), 26 sanitary sewer manholes to be replaced or rehabilitated (232 VF total), bypass pumping, site restoration.
Posted Date
Dec 16, 2025
Due Date
Jan 16, 2026
Release: Dec 16, 2025
Close: Jan 16, 2026
Work includes 2,450 LF, 12 DIP sanitary sewer (open cut), 532 LF pipe burst existing 8" pipe to 12" HDPE sanitary sewer, 811 LF pipe burst existing 10" pipe to 12" HDPE sanitary sewer, 60 LF 24" steel casing (open cut), 26 sanitary sewer manholes to be replaced or rehabilitated (232 VF total), bypass pumping, site restoration.