Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of services for Jefferson Street Storm Sewer Improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 1,715 TN of 6" aggregate base - type AB-3; 62 TN of crushed rock surfacing - driveways; 3,860 SY of pavement removal; 35 SY of 6" asphaltic concrete driveway; 300 LF of silt fence; 89 LF of 15" storm sewer (RCP); see attached files.
Posted Date
Dec 10, 2025
Due Date
Jan 13, 2026
Release: Dec 10, 2025
Close: Jan 13, 2026
Work includes 1,715 TN of 6" aggregate base - type AB-3; 62 TN of crushed rock surfacing - driveways; 3,860 SY of pavement removal; 35 SY of 6" asphaltic concrete driveway; 300 LF of silt fence; 89 LF of 15" storm sewer (RCP); see attached files.
AvailablePremium
Access the largest public sector contact database
Work includes 1,715 TN of 6" aggregate base - type AB-3; 62 TN of crushed rock surfacing - driveways; 3,860 SY of pavement removal; 35 SY of 6" asphaltic concrete driveway; 300 LF of silt fence; 89 LF of 15" storm sewer (RCP); see attached files.
Posted Date
Dec 10, 2025
Due Date
Jan 13, 2026
Release: Dec 10, 2025
Close: Jan 13, 2026
Work includes 1,715 TN of 6" aggregate base - type AB-3; 62 TN of crushed rock surfacing - driveways; 3,860 SY of pavement removal; 35 SY of 6" asphaltic concrete driveway; 300 LF of silt fence; 89 LF of 15" storm sewer (RCP); see attached files.
AvailableThis RFP is for Auburn Street Reconstruction services.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
This RFP is for Auburn Street Reconstruction services.
AvailableReconstruction of street. Storm sewer installation and construction of a stormwater detention basin. The reconstruction of street will include installation of sidewalk, curb, storm sewer, water line relocation, and sanitary sewer relocation. Work includes, 6,508 CY of unclassified excavation; 3,542 CY of embankment with excavated material; 13,334 SY of geogrid for subgrade stabilization; 1,400 SY of 4" concrete sidewalk; 5,000 LF of curb and gutter type cg - 1; 400 LF of 6" pvc sanitary sewer pipe; 14 CY of sanitary sewer pipe encasement; 1,150 LF of 10" pvc sanitary sewer pipe; 1,704 LF of 3/4" copper water main service; 3,512 LF of 8" pvc water main; 6,610 LF of silt fence; 2823 LF of pavement marking, 4" yellow - high build paint; 200 SY of retaining wall. See outside link.
Posted Date
Dec 1, 2025
Due Date
Dec 22, 2025
Release: Dec 1, 2025
Close: Dec 22, 2025
Reconstruction of street. Storm sewer installation and construction of a stormwater detention basin. The reconstruction of street will include installation of sidewalk, curb, storm sewer, water line relocation, and sanitary sewer relocation. Work includes, 6,508 CY of unclassified excavation; 3,542 CY of embankment with excavated material; 13,334 SY of geogrid for subgrade stabilization; 1,400 SY of 4" concrete sidewalk; 5,000 LF of curb and gutter type cg - 1; 400 LF of 6" pvc sanitary sewer pipe; 14 CY of sanitary sewer pipe encasement; 1,150 LF of 10" pvc sanitary sewer pipe; 1,704 LF of 3/4" copper water main service; 3,512 LF of 8" pvc water main; 6,610 LF of silt fence; 2823 LF of pavement marking, 4" yellow - high build paint; 200 SY of retaining wall. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis