Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Perform Vendor On-Site Repair Service on Garaventa Lift, model: GSL Artira, serial number: 67171
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The contractor will clean, disassemble and repair the broken components of 2 (two) sewer lift station pumps.
Posted Date
Jun 3, 2025
Due Date
Jun 6, 2029
Release: Jun 3, 2025
Close: Jun 6, 2029
The contractor will clean, disassemble and repair the broken components of 2 (two) sewer lift station pumps.
AvailablePremium
Access the largest public sector contact database
Remove an old fence and install a new fence. Fence will provide security to prevent access to unauthorize people, property boundaries, safety for visitors and employees. Contractor shall provide materials, labor, and equipment. Ensure work meets safety and local code requirements. Contractor shall remove and dispose of the existing fence. Contractor shall install 250 of new 8 tall chain link fence including one new 30 wide aluminum slide gate 280 of 6 chain link fence, 280 of 6 perimeter fence, 40 of aluminum ornamental fence, replace the leaning 4 posts, replace 20 of chain link fence, install new rollers and reinstall the two gates, and install new wrought iron fence.
Posted Date
Nov 17, 2025
Due Date
Dec 12, 2025
Release: Nov 17, 2025
Close: Dec 12, 2025
Remove an old fence and install a new fence. Fence will provide security to prevent access to unauthorize people, property boundaries, safety for visitors and employees. Contractor shall provide materials, labor, and equipment. Ensure work meets safety and local code requirements. Contractor shall remove and dispose of the existing fence. Contractor shall install 250 of new 8 tall chain link fence including one new 30 wide aluminum slide gate 280 of 6 chain link fence, 280 of 6 perimeter fence, 40 of aluminum ornamental fence, replace the leaning 4 posts, replace 20 of chain link fence, install new rollers and reinstall the two gates, and install new wrought iron fence.
The Maryland Department of Planning (through the Maryland Historical Trust/Jefferson Patterson Park & Museum) issued an Invitation for Bids to repair the slope on the dry dam at Jefferson Patterson Park & Museum (JPPM). The work includes furnishing all labor, equipment, materials, tests, supervision and services necessary to repair the dry dam slope; bidders must submit specified forms (bid/proposal affidavit, conflict of interest affidavit, references, insurance certificates) and acknowledge any amendments. Bids are due by December 19, 2025 (received no later than 3:00 PM local time) and the solicitation is open and NOT a grant.
Posted Date
Nov 19, 2025
Due Date
Dec 19, 2025
Release: Nov 19, 2025
Close: Dec 19, 2025
The Maryland Department of Planning (through the Maryland Historical Trust/Jefferson Patterson Park & Museum) issued an Invitation for Bids to repair the slope on the dry dam at Jefferson Patterson Park & Museum (JPPM). The work includes furnishing all labor, equipment, materials, tests, supervision and services necessary to repair the dry dam slope; bidders must submit specified forms (bid/proposal affidavit, conflict of interest affidavit, references, insurance certificates) and acknowledge any amendments. Bids are due by December 19, 2025 (received no later than 3:00 PM local time) and the solicitation is open and NOT a grant.
AvailableTo provide diagnosis and repair of one (1) PKS 80k 4-post lift for intermittent fault causing lift to stop functioning. Preliminary diagnosis determined that an updated control console with new screen readout is required. The required services will include the diagnosis, repair, and all related parts as required to fully repair the following equipment: PKS 80K 4-Post Lift; Model Number PK80E-4-30; Serial Number 22745; Capacity 80,000 lbs. The Equipment repair to be completed includes but is not limited to: Preliminary diagnosis/evaluation to determine cause of concern. Replacement of updated control console with new screen readout if determined to be the cause of the concern. Replacement of any additional parts identified. Perform any procedures, adjustments and/or calibrations required to ensure a fully functional lift. Verification of normal operation after repairs.
Posted Date
Dec 9, 2025
Due Date
Jan 9, 2026
Release: Dec 9, 2025
Close: Jan 9, 2026
To provide diagnosis and repair of one (1) PKS 80k 4-post lift for intermittent fault causing lift to stop functioning. Preliminary diagnosis determined that an updated control console with new screen readout is required. The required services will include the diagnosis, repair, and all related parts as required to fully repair the following equipment: PKS 80K 4-Post Lift; Model Number PK80E-4-30; Serial Number 22745; Capacity 80,000 lbs. The Equipment repair to be completed includes but is not limited to: Preliminary diagnosis/evaluation to determine cause of concern. Replacement of updated control console with new screen readout if determined to be the cause of the concern. Replacement of any additional parts identified. Perform any procedures, adjustments and/or calibrations required to ensure a fully functional lift. Verification of normal operation after repairs.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis