Summary
The Contractor shall provide a one-time service to provide and install light fixtures in the Boiler Plant, Building 21 (B.21). The Contractor shall furnish all labor, travel, equipment, supplies and materials required to perform the installation of the light fixtures for B.21. Existing Light Fixture Removal: There are eight (8) ceiling lights, approximately 30 feet high, suspended from brackets, that are accessible with a Lift. There are seven (7) ceiling light fixtures, approximately 10 feet high, suspended from brackets, accessible with a regular ladder. Light fixtures will be removed from the brackets and disposed of by the Contractor. See Attachment ‘A’ for images of existing light fixtures. See attached file.