Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project consists of but is not limited to; removing existing wall hall building, complete, from the site and maintain existing utilities that traverse the site. Cap any abandoned utilities. Remove and provide new pavement as indicated, and perform site clearing, grading, and restoration as indicated.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Rehabilitation of one (1) home and four (4) demo/replacement homes.
Posted Date
Dec 9, 2025
Due Date
Jan 12, 2026
Release: Dec 9, 2025
Close: Jan 12, 2026
Rehabilitation of one (1) home and four (4) demo/replacement homes.
AvailablePremium
Access the largest public sector contact database
Project consists of demo and rebuild. See outside link.
Posted Date
Dec 13, 2025
Due Date
Dec 19, 2025
Release: Dec 13, 2025
Close: Dec 19, 2025
Project consists of demo and rebuild. See outside link.
Work includes selective sitework and fencing. Selective miscellaneous demo. Stone masonry repairs, repointing, and selective reconstruction. Excavation and retaining wall waterproofing and drainage. Existing underground concrete vault structural reinforcement.
Posted Date
Nov 18, 2025
Due Date
Dec 22, 2025
Release: Nov 18, 2025
Close: Dec 22, 2025
Work includes selective sitework and fencing. Selective miscellaneous demo. Stone masonry repairs, repointing, and selective reconstruction. Excavation and retaining wall waterproofing and drainage. Existing underground concrete vault structural reinforcement.
AvailableWork consists of drywall repair, electrical work, flooring, wall tile, shelving/ cabinets, trim carpentry, door widening and install, wall bolstering for grab bars, painting, and installation of fixtures.
Posted Date
Dec 11, 2025
Due Date
Dec 29, 2025
Release: Dec 11, 2025
Close: Dec 29, 2025
Work consists of drywall repair, electrical work, flooring, wall tile, shelving/ cabinets, trim carpentry, door widening and install, wall bolstering for grab bars, painting, and installation of fixtures.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis