Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Camera replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Replacing its IP security camera systems at the regional transit center (MRTC) and the transit maintenance facility (TMF) with a hybrid cloud-based security camera system.
Posted Date
Dec 2, 2025
Due Date
Jan 5, 2026
Release: Dec 2, 2025
Close: Jan 5, 2026
Replacing its IP security camera systems at the regional transit center (MRTC) and the transit maintenance facility (TMF) with a hybrid cloud-based security camera system.
AvailablePremium
Access the largest public sector contact database
Comprehensive surveillance camera and access control system upgrade and replacement.
Posted Date
Nov 26, 2025
Due Date
Jan 5, 2026
Release: Nov 26, 2025
Close: Jan 5, 2026
Comprehensive surveillance camera and access control system upgrade and replacement.
AvailableProvide camera replacement. Replace analog ICU and MICU observation cameras which were installed over 10 years ago and are aging and in some instances failing. This system of cameras needs to be replaced and upgraded to an IP-based camera system. Switch must have 16 ports with full PoE+ capability (at least 240W power budget) and 10/100/1000 Base-T and 2 Gigabit SFP ports. See attached file.
Posted Date
Dec 10, 2025
Due Date
Dec 25, 2025
Release: Dec 10, 2025
Close: Dec 25, 2025
Provide camera replacement. Replace analog ICU and MICU observation cameras which were installed over 10 years ago and are aging and in some instances failing. This system of cameras needs to be replaced and upgraded to an IP-based camera system. Switch must have 16 ports with full PoE+ capability (at least 240W power budget) and 10/100/1000 Base-T and 2 Gigabit SFP ports. See attached file.
AvailableDesign-build: work includes systemwide blind spot cameras and camera lowering device replacement.
Posted Date
Nov 5, 2025
Due Date
Dec 18, 2025
Release: Nov 5, 2025
Close: Dec 18, 2025
Design-build: work includes systemwide blind spot cameras and camera lowering device replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis