Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Lubbock issued Invitation to Bid (ITB 26-19317-YB) for replacement of gate valves across the City's water distribution system, including removal of existing valves, installation of new gate valves, testing/inspection, and restoration of disturbed areas. The estimated project value is about $700,000$800,000 (HigherGov AI estimate) with a 100-calendar-day substantial completion requirement from Notice to Proceed. Responses are due 12/30/2025 at 3:00 PM (local time) on the official ESBD posting; the solicitation is a standard procurement (not a grant) and the ESBD status is Posted (open).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Miscellaneous flap gate, sluice gate, and valve replacements.
Posted Date
Nov 7, 2025
Due Date
Dec 18, 2025
Release: Nov 7, 2025
Close: Dec 18, 2025
Miscellaneous flap gate, sluice gate, and valve replacements.
AvailablePremium
Access the largest public sector contact database
Miscellaneous flap gate, sluice gate, and valve replacements.
Posted Date
Nov 7, 2025
Due Date
Dec 18, 2025
Release: Nov 7, 2025
Close: Dec 18, 2025
Miscellaneous flap gate, sluice gate, and valve replacements.
AvailableProvide and install four replacement 24" gate valves on the suction header piping at pumping station 9 of the city's potable water distribution system. Contractor shall also purchase, deliver, and install four (4) replacement 18" double door check valves that are located on the discharge side of each pump. The contractor shall remove all existing insulation materials to facilitate removal and installation of the new replacement check valves. See attached files.
Posted Date
Dec 7, 2025
Due Date
Dec 30, 2025
Release: Dec 7, 2025
Close: Dec 30, 2025
Provide and install four replacement 24" gate valves on the suction header piping at pumping station 9 of the city's potable water distribution system. Contractor shall also purchase, deliver, and install four (4) replacement 18" double door check valves that are located on the discharge side of each pump. The contractor shall remove all existing insulation materials to facilitate removal and installation of the new replacement check valves. See attached files.
AvailableProvide and install four replacement 24" gate valves on the suction header piping at pumping station 9 of the city's potable water distribution system. Contractor shall also purchase, deliver, and install four (4) replacement 18" double door check valves that are located on the discharge side of each pump. The contractor shall remove all existing insulation materials to facilitate removal and installation of the new replacement check valves. See attached files.
Posted Date
Dec 7, 2025
Due Date
Dec 30, 2025
Release: Dec 7, 2025
Close: Dec 30, 2025
Provide and install four replacement 24" gate valves on the suction header piping at pumping station 9 of the city's potable water distribution system. Contractor shall also purchase, deliver, and install four (4) replacement 18" double door check valves that are located on the discharge side of each pump. The contractor shall remove all existing insulation materials to facilitate removal and installation of the new replacement check valves. See attached files.