Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Park shoreline stabilization.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Accepting sealed bids for shoreline stabilization. Shoreline stabilization would include the use of rip rap along approx 525ft of shoreline with approx 325 tons of rip rap. Shoreline stabilization (rip rap) shall be installed by boat.
Posted Date
Nov 10, 2025
Due Date
Jan 8, 2026
Release: Nov 10, 2025
Close: Jan 8, 2026
Accepting sealed bids for shoreline stabilization. Shoreline stabilization would include the use of rip rap along approx 525ft of shoreline with approx 325 tons of rip rap. Shoreline stabilization (rip rap) shall be installed by boat.
AvailablePremium
Access the largest public sector contact database
The City of Fairhope seeks qualified contractors for the Magnolia Beach Restoration and Stabilization Project, involving restoration of 650 linear feet of beach, placement of 7,700 cubic yards of sand, construction of rock headland breakwater structures, and installation of sod and sand fencing.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
The City of Fairhope seeks qualified contractors for the Magnolia Beach Restoration and Stabilization Project, involving restoration of 650 linear feet of beach, placement of 7,700 cubic yards of sand, construction of rock headland breakwater structures, and installation of sod and sand fencing.
AvailableThe City of Fairhope seeks qualified contractors for the Magnolia Beach Restoration and Stabilization Project, involving restoration of 650 linear feet of beach, placement of 7,700 cubic yards of sand, construction of rock headland breakwater structures, and installation of sod and sand fencing.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
The City of Fairhope seeks qualified contractors for the Magnolia Beach Restoration and Stabilization Project, involving restoration of 650 linear feet of beach, placement of 7,700 cubic yards of sand, construction of rock headland breakwater structures, and installation of sod and sand fencing.
AvailableThe Tennessee Wildlife Resources Agency (TWRA) is soliciting bids for repair and shoreline stabilization work at the Rankin Boat Ramp in Cocke County, Tennessee. The project includes repair/installation of soil, rock, geotextile, mulch, vegetation, and removal/disposal of trees, logs and stumps, with a required mandatory site visit and pre-bid meeting. Work must be completed within sixty (60) days of notice to proceed and must comply with TOSHA/OSHA and state procurement and environmental regulations.
Posted Date
Nov 26, 2025
Due Date
Jan 5, 2026
Release: Nov 26, 2025
Close: Jan 5, 2026
The Tennessee Wildlife Resources Agency (TWRA) is soliciting bids for repair and shoreline stabilization work at the Rankin Boat Ramp in Cocke County, Tennessee. The project includes repair/installation of soil, rock, geotextile, mulch, vegetation, and removal/disposal of trees, logs and stumps, with a required mandatory site visit and pre-bid meeting. Work must be completed within sixty (60) days of notice to proceed and must comply with TOSHA/OSHA and state procurement and environmental regulations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis