Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Bar Harbor
Work under this project includes the installation of a potable water concrete storage tank including all materials, equipment, labor, and incidentals related to a complete tank installation project including all sitework required in support of the tank including clearing, ledge removal, grading, waterline piping, wedge valves, sitework, pavement, demolition work, fencing, roadway improvements, geotextiles, trench insulation, earthwork, structural fill, drain piping, fittings, vault, valves, expansion joints, erosion control, precast concrete valve vault, chemical feed system and analyzers, circulation pump, catch basin, drainage, concrete, generator pad and propane generator, electrical, tank mixer, instrumentation, accessories, and incidentals required for a complete working replacement potable water storage tank system.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Chuckey Utility District
Construction of water storage tank.
Posted Date
Oct 30, 2025
Due Date
Nov 20, 2025
Release: Oct 30, 2025
Chuckey Utility District
Close: Nov 20, 2025
Construction of water storage tank.
AvailableCity of Alma
Project includes the internal and external recoating of one (1) 1,000,000-GAL ground water storage tank, and one (1) 400,000 GAL elevated water storage tank. See outside link.
Posted Date
Nov 17, 2025
Due Date
Dec 2, 2025
Release: Nov 17, 2025
City of Alma
Close: Dec 2, 2025
Project includes the internal and external recoating of one (1) 1,000,000-GAL ground water storage tank, and one (1) 400,000 GAL elevated water storage tank. See outside link.
AvailableHeadwaters Soil And Water Conservation District
Work includes installation of a 0.5 million gallon ground storage tank and appurtenances associated with the tank and the surrounding area within 20 feet of the tank structure.
Posted Date
Nov 14, 2025
Due Date
Jan 14, 2026
Release: Nov 14, 2025
Headwaters Soil And Water Conservation District
Close: Jan 14, 2026
Work includes installation of a 0.5 million gallon ground storage tank and appurtenances associated with the tank and the surrounding area within 20 feet of the tank structure.
AvailableBarrow County
Construction of water storage tank.
Posted Date
Aug 5, 2025
Due Date
Nov 20, 2025
Release: Aug 5, 2025
Barrow County
Close: Nov 20, 2025
Construction of water storage tank.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis