Summary
Work under this project includes the installation of a potable water concrete storage tank including all materials, equipment, labor, and incidentals related to a complete tank installation project including all sitework required in support of the tank including clearing, ledge removal, grading, waterline piping, wedge valves, sitework, pavement, demolition work, fencing, roadway improvements, geotextiles, trench insulation, earthwork, structural fill, drain piping, fittings, vault, valves, expansion joints, erosion control, precast concrete valve vault, chemical feed
system and analyzers, circulation pump, catch basin, drainage, concrete, generator pad and propane generator, electrical, tank mixer, instrumentation, accessories, and incidentals required for a
complete working replacement potable water storage tank system.