Summary
The work includes modifications to the pier marine gasoline fueling system including the following: relocate leak detection system (and associated alarms/shutoffs), install valves/test ports as required, design/install required leak containments, replace fuel dispensers/hose reel equipment, evaluate lighting requirements, correct existing code deficiencies, correct existing equipment condition deficiencies, install isolation valves, install/relocate alarms and lights in places with visual and auditory proximity to operator, test the complete system, create emergency response and normal system operation procedures, conduct MOGAS Dispenser Relocation Study, install signage/holders for emergency response, add pipe/hose identification labels and incidental related work.