Summary
Work includes approx. 1,700LF of 6" DR18 C900 PVC Sewer Force Main Pipe and Fittings; 1 EA of 6" Sewer Force Main Plug Valves; 1 EA of 5' Blow-off/Clean Out Manholes and Associated Fittings; 600 LF of 12"” SDR35 PVC
Gravity Sewer Main Pipe; 850 LF of 12” SDR35 and SDR21 PVC Gravity Sewer Main Pipe; 66 EA of gravity sewer manhole; 164 EA of 1.25" SCH40 PVC Low
Pressure Sewer Service Connection; 5 EA of Air/Vacuum Valve Manholes
and Associated Fittings; 60 LF of 12” HDPE Drain Pipe; 750 CY of Exploratory Excavation; 250 CY of rock excavation; 24,500 SY of Trench Pavement (3” Depth); 400 SY of Asphalt Driveway and Sidewalk Restoration; 7,500 SY of Loam and Seed; sediment control;