Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Safety enhancements to the building to reduce hazards associated with routine maintenance activities on the boilers, pumps, and dampers.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construct a broiler house unit for agriculture research. The broiler house will have a control room, pad room, and main feeding room. Requirements include a cool cell watering and ventilation system, hot and cold weather environmental systems, ventilation fans and doors, above-ground propane tank, feed storage bin, feed scales, poultry scales, litter management equipment, concrete pads at receiving area, cleaning equipment, and sidewall drop curtains, and all related work.
Posted Date
Oct 3, 2025
Due Date
Dec 17, 2025
Release: Oct 3, 2025
Close: Dec 17, 2025
Construct a broiler house unit for agriculture research. The broiler house will have a control room, pad room, and main feeding room. Requirements include a cool cell watering and ventilation system, hot and cold weather environmental systems, ventilation fans and doors, above-ground propane tank, feed storage bin, feed scales, poultry scales, litter management equipment, concrete pads at receiving area, cleaning equipment, and sidewall drop curtains, and all related work.
Premium
Access the largest public sector contact database
Work includes sr-205 repairs and safety improvements.
Posted Date
Nov 14, 2025
Due Date
Dec 15, 2025
Release: Nov 14, 2025
Close: Dec 15, 2025
Work includes sr-205 repairs and safety improvements.
AvailableProvide general contracting for HVAC improvements at the 39-unit Eastridge House apartments. The proposed scope of work (SOW) involves the removal and replacement (new) of all electric heaters in the corridors, elevator lobbies, community room, laundry rooms, select storage rooms, public men's room and all other locations per the drawings. All new wiring must be concealed behind Gypsum Wall Board (GWB) or in KCHA-approved line hide, wire mold, or cover. There may be variations in the layout from the plan depictions, and it is the Contractor's responsibility to verify actual conditions. The Contractor is to carry a contingency in their bid proposal accounting for variations and will be responsible for all wiring, HVAC installation, routing, connections, testing, commissioning, balancing and restoration of the interior and exterior finishes or areas affected by the work. Contractor will not be entering apartments for this project.
Posted Date
Dec 3, 2025
Due Date
Jan 7, 2026
Release: Dec 3, 2025
Close: Jan 7, 2026
Provide general contracting for HVAC improvements at the 39-unit Eastridge House apartments. The proposed scope of work (SOW) involves the removal and replacement (new) of all electric heaters in the corridors, elevator lobbies, community room, laundry rooms, select storage rooms, public men's room and all other locations per the drawings. All new wiring must be concealed behind Gypsum Wall Board (GWB) or in KCHA-approved line hide, wire mold, or cover. There may be variations in the layout from the plan depictions, and it is the Contractor's responsibility to verify actual conditions. The Contractor is to carry a contingency in their bid proposal accounting for variations and will be responsible for all wiring, HVAC installation, routing, connections, testing, commissioning, balancing and restoration of the interior and exterior finishes or areas affected by the work. Contractor will not be entering apartments for this project.
AvailableConstruction improvements to the ott cribbs public safety center. The project is expected to include construction services for plumbing, elevator, and exterior/interior improvements, while ensuring the continued safe operation of the facility and minimizing disruption to ongoing operations.
Posted Date
Nov 18, 2025
Due Date
Dec 18, 2025
Release: Nov 18, 2025
Close: Dec 18, 2025
Construction improvements to the ott cribbs public safety center. The project is expected to include construction services for plumbing, elevator, and exterior/interior improvements, while ensuring the continued safe operation of the facility and minimizing disruption to ongoing operations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis