Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Iowa City Community School District is soliciting bids for roof improvements at West High School in Iowa City, Iowa. Shive‑Hattery is administering the bid documents and planholder process through its online planroom. Bids are due January 29, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This summer project consists of removal and replacement of five roof sections at Lucas Elementary School approximately 16,900 sf. This work includes removal of existing modified bitumen roofing and replacement with 60 mil PVC roofing and R-30 insulation system with a 20- year warranty. Additional work includes repairs to insulated ductwork, ductwork detaching and resetting, and replacing seven roof drains.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
This summer project consists of removal and replacement of five roof sections at Lucas Elementary School approximately 16,900 sf. This work includes removal of existing modified bitumen roofing and replacement with 60 mil PVC roofing and R-30 insulation system with a 20- year warranty. Additional work includes repairs to insulated ductwork, ductwork detaching and resetting, and replacing seven roof drains.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This summer construction project will include roof replacements at two locations, approximately 8,900 sf total. The work required at Wickham Elementary consists of removal and replacement of a ballasted EPDM roof and replacement of a new adhered 90 mil EPDM with an R-30 insulation system with a 30-year warranty. At Southeast Middle School, work will include removal and replacement of two existing modified bitumen roofs and replacement with a new adhered 60 mil PVC with an R-30 insulation system and a 20-year warranty. Additional work required for the project includes insulated above-roof ductwork repairs, and detaching and resetting a HVAC unit including raising curb height and adjusting ductwork.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
This summer construction project will include roof replacements at two locations, approximately 8,900 sf total. The work required at Wickham Elementary consists of removal and replacement of a ballasted EPDM roof and replacement of a new adhered 90 mil EPDM with an R-30 insulation system with a 30-year warranty. At Southeast Middle School, work will include removal and replacement of two existing modified bitumen roofs and replacement with a new adhered 60 mil PVC with an R-30 insulation system and a 20-year warranty. Additional work required for the project includes insulated above-roof ductwork repairs, and detaching and resetting a HVAC unit including raising curb height and adjusting ductwork.
AvailableThe project consists of the removal and replacement of track surfacing. Removal and replacement of the synthetic turf. Remove and replace the goal posts. Fencing modifications.
Posted Date
-
Due Date
Feb 10, 2026
Release: -
Close: Feb 10, 2026
The project consists of the removal and replacement of track surfacing. Removal and replacement of the synthetic turf. Remove and replace the goal posts. Fencing modifications.
AvailableThe project consists of the removal and replacement of track surfacing. Removal and replacement of the synthetic turf. Remove and replace the goal posts. Fencing modifications.
Posted Date
-
Due Date
Feb 10, 2026
Release: -
Close: Feb 10, 2026
The project consists of the removal and replacement of track surfacing. Removal and replacement of the synthetic turf. Remove and replace the goal posts. Fencing modifications.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →