Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
IC Project F - Switches / UPS 5 Year.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide combustion IC and profiler-F installation and training services.
Posted Date
Nov 26, 2025
Due Date
Dec 23, 2025
Release: Nov 26, 2025
Close: Dec 23, 2025
Provide combustion IC and profiler-F installation and training services.
AvailablePremium
Access the largest public sector contact database
Provide turnkey replacement, consolidation, installation, and modernization services for the City’s Uninterruptible Power Supply (UPS) systems across all municipal facilities. The project includes replacing non-compliant UPS units, installing compatible maintenance-bypass hardware, performing required electrical and conduit modifications, integrating UPS systems into a unified monitoring platform, and providing diagnostic testing and commissioning services.
Posted Date
Dec 3, 2025
Due Date
Jan 8, 2026
Release: Dec 3, 2025
Close: Jan 8, 2026
Provide turnkey replacement, consolidation, installation, and modernization services for the City’s Uninterruptible Power Supply (UPS) systems across all municipal facilities. The project includes replacing non-compliant UPS units, installing compatible maintenance-bypass hardware, performing required electrical and conduit modifications, integrating UPS systems into a unified monitoring platform, and providing diagnostic testing and commissioning services.
AvailableTo purchase 5 (five) ¾ ton animal transport pick-ups for Lubbock Animal Services.
Posted Date
Nov 26, 2025
Due Date
Dec 16, 2025
Release: Nov 26, 2025
Close: Dec 16, 2025
To purchase 5 (five) ¾ ton animal transport pick-ups for Lubbock Animal Services.
AvailablePurchase 5 Aruba switches, 25 wireless access points, and 5 Transceivers plus needed accessories. Our preferred switch brand is Aruba, due to the makeup of the current district infrastructure. The Aruba CX type switching protocol is our preferred switch type for these nodes. The Aruba 615 Campus AP is our preferred WAP. Vendors may submit alternative equipment as long as the equipment is an equivalent make and model and serves the same functionality. Bid Responses should have WAPS, switches, transceivers, power supplies, mounting kits, licenses, cables, and installation/configuration costs listed as separate line items in a parts list that include manufacturer part number.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
Purchase 5 Aruba switches, 25 wireless access points, and 5 Transceivers plus needed accessories. Our preferred switch brand is Aruba, due to the makeup of the current district infrastructure. The Aruba CX type switching protocol is our preferred switch type for these nodes. The Aruba 615 Campus AP is our preferred WAP. Vendors may submit alternative equipment as long as the equipment is an equivalent make and model and serves the same functionality. Bid Responses should have WAPS, switches, transceivers, power supplies, mounting kits, licenses, cables, and installation/configuration costs listed as separate line items in a parts list that include manufacturer part number.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis