The project generally consists of the installation of a new outdoor-grade dedicated outdoor air system (doas) unit with new ductwork and new indoor and outdoor variable refrigerant flow (vrf) condensing unit, and associated work. The bid alternate generally consists of the installation of new main trunk piping and valves to replace existing, and associated work.
What to Include In Your Proposal
Starbridge can help you:
✓
Pain points mentioned in board meetings and strategic plans
✓
Instantly outline and draft all requirements
✓
Bring in your USPs and exploit competitor gaps
Win These Opportunities Next
Starbridge can help you:
✓
Get ahead of RFPs — target accounts planning budget or ending contracts soon
✓
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
✓
Starbridge.ai books 30 - 40% of leads into meetings
Files
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project includes but is not limited to replacement of two roof-top air handling units, addition and reconfiguration of interior
fan-terminal boxes, replacement and upgrade of the building automation/temperature controls system and isolation of the
evidence storage room.
The project includes but is not limited to replacement of two roof-top air handling units, addition and reconfiguration of interior
fan-terminal boxes, replacement and upgrade of the building automation/temperature controls system and isolation of the
evidence storage room.
The project includes but is not limited to replacement of two roof-top air handling units, addition and reconfiguration of interior
fan-terminal boxes, replacement and upgrade of the building automation/temperature controls system and isolation of the
evidence storage room.
The project includes but is not limited to replacement of two roof-top air handling units, addition and reconfiguration of interior
fan-terminal boxes, replacement and upgrade of the building automation/temperature controls system and isolation of the
evidence storage room.
Installation of new heat recovery units (hru-1 through hru-4), roof exhaust fans, inline duct fans, louvers, ultraviolet odor control devices, and associated ductwork, supports, and accessories as indicated. Installation of new heating and cooling equipment including air-cooled condensing units and associated indoor equipment, refrigerant piping, condensate piping, and related accessories. Installation of new gas piping systems, regulators, meters, and connections to existing gas service as required to serve new equipment, including coordination with the utility company. Installation of new mechanical ductwork systems including supply, return, exhaust, and outside air systems, with associated dampers, actuators, access doors, insulation, and accessories
Installation of new heat recovery units (hru-1 through hru-4), roof exhaust fans, inline duct fans, louvers, ultraviolet odor control devices, and associated ductwork, supports, and accessories as indicated. Installation of new heating and cooling equipment including air-cooled condensing units and associated indoor equipment, refrigerant piping, condensate piping, and related accessories. Installation of new gas piping systems, regulators, meters, and connections to existing gas service as required to serve new equipment, including coordination with the utility company. Installation of new mechanical ductwork systems including supply, return, exhaust, and outside air systems, with associated dampers, actuators, access doors, insulation, and accessories