Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Hvac replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide improvements to AEM lab & shop. The scope of work architectural improvements include removing and replacing gypsum board at three office spaces to allow for the installation of batt insulation, and new frame gypsum board ceiling at office 221. It also includes patching, retexturing, and repainting walls and ceiling at the lab area and fire rated walls, and replacing and properly attaching roof and wall liner fabric insulation that is missing or damaged throughout the shop/lab building.
Posted Date
Nov 18, 2025
Due Date
Jan 7, 2026
Release: Nov 18, 2025
Close: Jan 7, 2026
Provide improvements to AEM lab & shop. The scope of work architectural improvements include removing and replacing gypsum board at three office spaces to allow for the installation of batt insulation, and new frame gypsum board ceiling at office 221. It also includes patching, retexturing, and repainting walls and ceiling at the lab area and fire rated walls, and replacing and properly attaching roof and wall liner fabric insulation that is missing or damaged throughout the shop/lab building.
Premium
Access the largest public sector contact database
Hvac replacement
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Hvac replacement
AvailableHvac maintenance at division central sign shop.
Posted Date
Nov 20, 2025
Due Date
Dec 16, 2025
Release: Nov 20, 2025
Close: Dec 16, 2025
Hvac maintenance at division central sign shop.
AvailableFull HVAC replacement for a 74,078 GSF building, to include new mechanical rooms, mechanical shafts, roof top equipment, associated partial demolition of building components to accommodate the HVAC replacement, and associated structural and electrical work.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Close: Dec 16, 2025
Full HVAC replacement for a 74,078 GSF building, to include new mechanical rooms, mechanical shafts, roof top equipment, associated partial demolition of building components to accommodate the HVAC replacement, and associated structural and electrical work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis