Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
High School gymnasium cooling via renovation of the HVAC system. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Removal and replacement of up to fifty-eight (58) rooftop/ground-mounted HVAC package units across various District facilities.
Posted Date
Jan 15, 2026
Due Date
Feb 9, 2026
Release: Jan 15, 2026
Close: Feb 9, 2026
Removal and replacement of up to fifty-eight (58) rooftop/ground-mounted HVAC package units across various District facilities.
AvailableProcurement of architectural planning, design, and construction administration services for roofing and HVAC replacement/modernization at San Andreas High School and Tamalpais Adult School.
Posted Date
Jan 5, 2026
Due Date
Jan 27, 2026
Release: Jan 5, 2026
Close: Jan 27, 2026
Procurement of architectural planning, design, and construction administration services for roofing and HVAC replacement/modernization at San Andreas High School and Tamalpais Adult School.
AvailableWork includes replacement of HVAC equipment at building e, replacement of plumbing and piping fixtures, replacement of interior light fixtures, finish upgrades, accessibility upgrades, fire alarm upgrades, new theatrical lighting system, theatrical rigging, and new stadium announcer's booth. The current bid package includes demolition/abatement, earthwork, asphalt, site utilities, concrete, shotcrete, structural frp, steel, carpentry, casework, roofing, insulation, sheet metal, doors/frames/hardware, glazing, drywall, plaster, ceramic tile, acoustical ceiling, flooring, gym flooring, athletic equipment, painting, theatrical drapery, classroom accessories, restroom accessories, plumbing, and fire alarm.
Posted Date
Dec 22, 2025
Due Date
Feb 6, 2026
Release: Dec 22, 2025
Close: Feb 6, 2026
Work includes replacement of HVAC equipment at building e, replacement of plumbing and piping fixtures, replacement of interior light fixtures, finish upgrades, accessibility upgrades, fire alarm upgrades, new theatrical lighting system, theatrical rigging, and new stadium announcer's booth. The current bid package includes demolition/abatement, earthwork, asphalt, site utilities, concrete, shotcrete, structural frp, steel, carpentry, casework, roofing, insulation, sheet metal, doors/frames/hardware, glazing, drywall, plaster, ceramic tile, acoustical ceiling, flooring, gym flooring, athletic equipment, painting, theatrical drapery, classroom accessories, restroom accessories, plumbing, and fire alarm.
AvailableThe Los Angeles Department of Water & Power (LADWP) issued an RFP to retrofit Unit 8 at the Haynes Generating Station by removing the existing once-through ocean cooling system and installing a recycled-water wet cooling system (cooling tower), related water infrastructure, and associated demolition and modernization work. The project requires design, procurement, construction, demolition, and commissioning services to allow Unit 8 to continue operation during and after retrofit; proposals must be submitted electronically through LADWP’s eRSP system. The opportunity is advertised as an RFP with a site visit/pre-proposal meeting scheduled and proposal questions to be submitted by specified deadlines; the procurement was open as of 2025-12-31 with a bid due date of March 31, 2026.
Posted Date
Dec 30, 2025
Due Date
Mar 31, 2026
Release: Dec 30, 2025
Close: Mar 31, 2026
The Los Angeles Department of Water & Power (LADWP) issued an RFP to retrofit Unit 8 at the Haynes Generating Station by removing the existing once-through ocean cooling system and installing a recycled-water wet cooling system (cooling tower), related water infrastructure, and associated demolition and modernization work. The project requires design, procurement, construction, demolition, and commissioning services to allow Unit 8 to continue operation during and after retrofit; proposals must be submitted electronically through LADWP’s eRSP system. The opportunity is advertised as an RFP with a site visit/pre-proposal meeting scheduled and proposal questions to be submitted by specified deadlines; the procurement was open as of 2025-12-31 with a bid due date of March 31, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis