Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Township of West Caldwell
Phase (01) consisting of removal, disposal, and replacement of the existing corridor ceiling and light fixtures for all floors. Existing ceiling-mounted systems on existing ceiling system to remain and be reattached to new ceiling system. New HVAC & Plumbing piping to bypass existing to be provided in corridor and rerouted to existing heat units & plumbing fixtures. Patching the existing roof deck/membrane, core drilling, masonry openings, partial wall demolition, and temporary removal of the existing ceiling grids inside rooms. Abatement at corridors. Phase (02): Existing HVAC & Plumbing piping inaccessible inside crawl spaces to be abandoned. New HVAC & Plumbing branch lines to tie-in to existing heat units & plumbing fixtures located inside rooms. Ceilings inside rooms to be modified to accommodate the new branch lines & tie-ins. Selective abatement at units & fixtures. System start-up & switchover; previous HVAC & Plumbing system to be removed to greatest extent possible.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Allegany County Public School District
The Board of Education of Allegany County seeks sealed bids to replace the HVAC piping system at Braddock Middle School in Cumberland, MD, according to plans prepared by RTM Engineering, Inc. Bids are due by December 4, 2025 at 2:00 PM local time, with a 5% bid security, a 15% MBE participation goal, and substantial completion required by August 7, 2026.
Posted Date
-
Due Date
Dec 4, 2025
Allegany County Public School District
Close: Dec 4, 2025
The Board of Education of Allegany County seeks sealed bids to replace the HVAC piping system at Braddock Middle School in Cumberland, MD, according to plans prepared by RTM Engineering, Inc. Bids are due by December 4, 2025 at 2:00 PM local time, with a 5% bid security, a 15% MBE participation goal, and substantial completion required by August 7, 2026.
AvailableDaytona Beach Housing Authority
Sanitary Clay Piping Replacement.
Posted Date
-
Due Date
Nov 26, 2025
Release: -
Daytona Beach Housing Authority
Close: Nov 26, 2025
Sanitary Clay Piping Replacement.
AvailableCurrituck County
Geothermal piping replacement.
Posted Date
Oct 29, 2025
Due Date
Nov 20, 2025
Release: Oct 29, 2025
Currituck County
Close: Nov 20, 2025
Geothermal piping replacement.
AvailableSumner County
Library HVAC Replacement. Provide one (1) new packaged unit equivalent to the existing unit currently installed at the library. The contractor is responsible for identifying a like or better replacement and must provide justification for the selected unit. Determine and install the required new circuit to the existing panel board. Removal and disposal of the existing unit. Provide any required piping, valves, and electrical installation, including new insulation and heat tracing for the outdoor CHW piping, if necessary. Provide tie-in to the building’s existing BAS system costs to be included, if necessary.
Posted Date
Oct 30, 2025
Due Date
Nov 20, 2025
Release: Oct 30, 2025
Sumner County
Close: Nov 20, 2025
Library HVAC Replacement. Provide one (1) new packaged unit equivalent to the existing unit currently installed at the library. The contractor is responsible for identifying a like or better replacement and must provide justification for the selected unit. Determine and install the required new circuit to the existing panel board. Removal and disposal of the existing unit. Provide any required piping, valves, and electrical installation, including new insulation and heat tracing for the outdoor CHW piping, if necessary. Provide tie-in to the building’s existing BAS system costs to be included, if necessary.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis