Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Sumner County
Library HVAC Replacement. Provide one (1) new packaged unit equivalent to the existing unit currently installed at the library. The contractor is responsible for identifying a like or better replacement and must provide justification for the selected unit. Determine and install the required new circuit to the existing panel board. Removal and disposal of the existing unit. Provide any required piping, valves, and electrical installation, including new insulation and heat tracing for the outdoor CHW piping, if necessary. Provide tie-in to the building’s existing BAS system costs to be included, if necessary.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Hendersonville
The City of Hendersonville is seeking bids for the FY26 HVAC Replacement project, which involves the installation of TRANE HVAC units with specific warranty requirements and includes all necessary permits and seismic curb adapters. The project requires the removal and disposal of old units and may involve the use of existing zone systems. Bidders must be licensed in Tennessee and provide proof of insurance.
Posted Date
Nov 6, 2025
Due Date
Nov 20, 2025
Release: Nov 6, 2025
City of Hendersonville
Close: Nov 20, 2025
The City of Hendersonville is seeking bids for the FY26 HVAC Replacement project, which involves the installation of TRANE HVAC units with specific warranty requirements and includes all necessary permits and seismic curb adapters. The project requires the removal and disposal of old units and may involve the use of existing zone systems. Bidders must be licensed in Tennessee and provide proof of insurance.
AvailableVillage of Fox Lake
HVAC system to replace one AAON rooftop HVAC unit. See attached file.
Posted Date
Oct 24, 2025
Due Date
Nov 24, 2025
Release: Oct 24, 2025
Village of Fox Lake
Close: Nov 24, 2025
HVAC system to replace one AAON rooftop HVAC unit. See attached file.
AvailableTown of North Branford
Seeking proposals and qualifications from building commissioning firms to provide comprehensive hvac commissioning.
Posted Date
Nov 3, 2025
Due Date
Dec 3, 2025
Release: Nov 3, 2025
Town of North Branford
Close: Dec 3, 2025
Seeking proposals and qualifications from building commissioning firms to provide comprehensive hvac commissioning.
AvailableCity of Orinda
Work consists of replacement of approx 160 SF of Owner provided exterior accent tile.
Posted Date
-
Due Date
Dec 9, 2025
City of Orinda
Close: Dec 9, 2025
Work consists of replacement of approx 160 SF of Owner provided exterior accent tile.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis