Retrieving RFP details
Release
Close
East Larimer County Water District
Construction of a recharge basin used to fulfill groundwater recharge requirement.
City of Dade City
The project involves the rejuvenation and consolidation of two existing stormwater ponds, including excavation, cleaning, regrading, landscaping, and fencing work to improve stormwater management, site safety, and aesthetics. The work shall include the following tasks: 1. Removal of existing berm. - Remove the existing berm-style wall separating the two stormwater ponds to allow consolidation into a single, larger pond. See attached file for full scope.
Central Texas Regional Mobility Authority
project will upgrade the existing WQ pond bedding from stone riprap to concrete riprap, replaces existing gabions and maintains the berms & sand filtration pond. 599 CY 6 Install 5" Concrete Riprap with toe wall; 1,135 SY 7 Excavation of Sand Filter Bed (4"); Setup Erosion Control;
Union County
The project consists of constructing the following: 1. Dredging of approximately 7000 CY of accumulated sediment from walden pond. 2. Miscellaneous civil/site work including storm drain piping, grading, erosion control, paving and other miscellaneous work; 3. Miscellaneous restoration activities.
Release
Oct 28, 2025
Close
Nov 26, 2025