Summary
Work includes mobilization, construction safety plan and traffic control, pavement removal, PCC 518 SY, topsoil, strip, salvage and spread 820 CY, 12" compacted subgrade 984 SY, base course 984 SY, PCC paving, 6" 890 SY, pavement markings (yellow) 100 SF, pavement marking (black outline) 251 SF, seeding, mulching, no. 6 awg, solid, bare counterpoise wire, installed in trench, including ground rods and connectors 555 LF, no. 8 awg, 5kv, l-824, type c cable, installed in trench, duct, or conduit 616 LF, regulator enclosure electrical work 1 EA, 1 way 2" schedule 40 pvc conduit, including trench and backfill 616 LF, l-861t (l) mitl, led, 24" tall, base mounted taxiway edge light w/arctic kit 13 EA, demo and removal of existing conduit and wire, spare parts.