City of Riverside
Project consists of constructing a raised median, grind and overlay, and high friction surface treatment (HFST). The project also includes signing and striping improvements along the project segment. Additionally, the project includes the replacement of existing detector loops at the signalized intersection.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Culver City
Avenue High Friction Surface Treatment Improvements .
Posted Date
Oct 30, 2025
Due Date
Dec 4, 2025
Release: Oct 30, 2025
City of Culver City
Close: Dec 4, 2025
Avenue High Friction Surface Treatment Improvements .
AvailableCity of San Rafael
Work includes 10 CY roadway excavation; 60 SY cold plane aspahlt concrete pavement; 860 SY microsurfacing; 32 TN hot mix asphalt; 450 SF curb ramp; 370 SF sidewalk; 110 SF curb and gutter; 1 LS rectangular rapid flashing beacon systems; 110 LF paint red curb; 700 LF thermoplastic traffic stripe; 1,000 SF pavement markings; 50 EA pavement markers.
Posted Date
Sep 8, 2025
Due Date
Nov 20, 2025
Release: Sep 8, 2025
City of San Rafael
Close: Nov 20, 2025
Work includes 10 CY roadway excavation; 60 SY cold plane aspahlt concrete pavement; 860 SY microsurfacing; 32 TN hot mix asphalt; 450 SF curb ramp; 370 SF sidewalk; 110 SF curb and gutter; 1 LS rectangular rapid flashing beacon systems; 110 LF paint red curb; 700 LF thermoplastic traffic stripe; 1,000 SF pavement markings; 50 EA pavement markers.
AvailableTownship of Montville
15 SY Milling; 2,100 tons HMA Surface Course; 5 units Infiltration Inlets.
Posted Date
Oct 27, 2025
Due Date
Dec 2, 2025
Release: Oct 27, 2025
Township of Montville
Close: Dec 2, 2025
15 SY Milling; 2,100 tons HMA Surface Course; 5 units Infiltration Inlets.
AvailableCity of Norco
The City of Norco seeks bids to construct storm drain improvements including approximately 200 linear feet of 18-inch RCP, PVC piping, concrete V-ditch, parkway drains, and catch basins along Parkridge Avenue and North Drive. The project also includes associated street improvements such as curb and gutter, wall repair, trench repair, and asphalt work.
Posted Date
Nov 13, 2025
Due Date
Dec 10, 2025
Release: Nov 13, 2025
City of Norco
Close: Dec 10, 2025
The City of Norco seeks bids to construct storm drain improvements including approximately 200 linear feet of 18-inch RCP, PVC piping, concrete V-ditch, parkway drains, and catch basins along Parkridge Avenue and North Drive. The project also includes associated street improvements such as curb and gutter, wall repair, trench repair, and asphalt work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis